Repository navigation
docs/npu-plan: the Not-yet list says what P5, P6 and P7 landed and what was not built (Refs #799) - #2221
docs/npu-plan: the Not-yet list says what P5, P6 and P7 landed and what was not built (Refs #799)#2221bong-water-water-bong wants to merge 1 commit into
Conversation
…at was not built (Refs #799) The P6 entry said the tau=0.6 acceptance rows were missing; they are on the leaderboard. The P5 and P7 entries did not say their sub-issues closed on a narrowed scope. Co-Authored-By: Claude Fable 5.2 <noreply@anthropic.com>
|
ready for review at 75f2c57 |
PR Reviewer Guide 🔍Here are some key observations to aid the review process:
|
|
Closing under the PR cap (16:45Z: at most two open per lane, no new PRs while main is red). This one was opened minutes before the cap and has no verdict; the branch |
Refs #799. Docs only, one file.
The plan tracker ends when its last sub-issue (P4) does. Before that happens the page's "Not yet" list should be true, and three of its entries were not:
docs/npu-leaderboard.mdlines 37-38) and the sub-issue's final comment has both gates measured on 8 prompts x 64 tokens. Only a second target's rows are missing, because there is no second targetNpuTargetin the engine, silicon timing, the layer on the DSPThe section now opens by saying what it is: the part of the plan that was not built, so the tracker ending does not read as all seven phases shipped.
Checked against the tree at main:
npu/target/holdstarget.handxdnaonly;--npu-target hexagonis refused by name (app/forward_serve.cpp:1097); the acceptance numbers are the leaderboard's and the P6 sub-issue's own table. No code, no measurement of mine.🤖 Generated with Claude Code