feat(wasserfoerderung): Förderstrecken planen — Rechner, Tab, PDF (#150, Plan A) - #152
Open
DeepDiver1975 wants to merge 1 commit into
Open
feat(wasserfoerderung): Förderstrecken planen — Rechner, Tab, PDF (#150, Plan A)#152DeepDiver1975 wants to merge 1 commit into
DeepDiver1975 wants to merge 1 commit into
Conversation
Signed-off-by: Thomas Müller <1005065+DeepDiver1975@users.noreply.github.com>
This file contains hidden or bidirectional Unicode text that may be interpreted or compiled differently than what appears below. To review, open the file in an editor that reveals hidden Unicode characters.
Learn more about bidirectional Unicode characters
Sign up for free
to join this conversation on GitHub.
Already have an account?
Sign in to comment
Add this suggestion to a batch that can be applied as a single commit.This suggestion is invalid because no changes were made to the code.Suggestions cannot be applied while the pull request is closed.Suggestions cannot be applied while viewing a subset of changes.Only one suggestion per line can be applied in a batch.Add this suggestion to a batch that can be applied as a single commit.Applying suggestions on deleted lines is not supported.You must change the existing code in this line in order to create a valid suggestion.Outdated suggestions cannot be applied.This suggestion has been applied or marked resolved.Suggestions cannot be applied from pending reviews.Suggestions cannot be applied on multi-line comments.Suggestions cannot be applied while the pull request is queued to merge.Suggestion cannot be applied right now. Please check back later.
Zusammenfassung
Plan A von #150: neuer WASSERFÖRDERUNG-Tab im Lagebuch, der Förderstrecken-Leitungen (Ltg 1, Ltg 2, …) rein offline plant. Ein hydraulischer Rechner (
FörderstreckePlanner) leitet aus Länge + Höhenunterschied die B-Schlauch- und Verstärkerpumpen-Positionen ab; die Zahlen sind unveränderlich gespeichert, damit PDF, Sync und alle Clients immer dasselbe zeigen.FörderstreckeConfig/FörderstreckePlannermit der B-800-Verlusttabelle (0,1 … 2,25 bar/100 m), Steigung 0,1 bar/m, flache Teilstrecke 620 m, 3 % Reserveschlauch, 1 Reservepumpe je 4 Verstärkerpumpen (Speisepumpe ausgenommen, wie abgestimmt).wass_leitungen), voller Round-Trip inkl. Pumpenpositionen (JSON).add/removeWasserfoerderungLeitung-Kommandos, Snapshot-DTO, Applier; die Leitungsnummer und alle abgeleiteten Werte berechnet der Host.Tests
826 Tests grün (Domain 232, AppLogic 294, Sync 60, Sync.Hosting 33, Persistence 91, Documents 25, Acceptance 89, App 2).
Screenshots
Vorher (leerer Tab):

Nachher (zwei geplante Leitungen, 2000 m/100 m und 400 m/0 m):

Planungshinweis: B-800, B-Schlauch 20 m, 8 bar Speisedruck, 1,5 bar Pumpeneingang (Config, anpassbar).