Repository navigation
Description
Task
T-112a· Milestone M8 — Dashboard · Size S · Priority P1 · Epic #8Implements FR-DSH-006
Branch
feat/t-112a-trials-list-and-experiment-detail— one task = one branch = one PR (doc 32 §6)
Summary
Implement features/trials/list and detail: experiments table, design table (strategies × seeds × budget) with progress per cell and links to child campaigns.
Context / motivation
US-010: compare strategies.
Scope
In scope
- Live progress via SSE bridge.
Out of scope
- Creating experiments from the UI (CLI/API only in v1).
Implementation guidance
features/trials/list/TrialsPage.tsx: experiments StatTable (name, strategies, seeds, budget, status, progress); creating experiments points to the CLI docs (v1 scope).features/trials/detail/ExperimentPage.tsx: design table strategies × seeds with per-cell status icons (done/running/failed) linking to child campaign consoles; overall progress.- Standards: respect the layering contracts (doc 16 §2) and conventions in doc 34; no hard-coded tunables — thresholds/defaults come from typed settings (doc 27); no magic numbers (ruff
PLR2004); public APIs typed (mypy strict) and documented.
Acceptance criteria
- Fixture experiment renders; cells link to campaigns.
- Cells link to the correct campaign ids.
- Feature flag
trialshides the section. - Tests listed below added and green in CI; coverage of new code meets the gate in doc 18 §3.
- Docs, config reference and CHANGELOG
Unreleasedupdated where behaviour, keys or interfaces changed. - Definition of Done (doc 32 §3) satisfied.
Tests required
features/trials/*.test.tsx.
Dependencies
Blocked by: #165 (T-085d), #167 (T-086b)
Blocks: #181 (T-112b)
Parallelization notes
Files / paths owned by this task — avoid editing other paths; shared files (pyproject.toml entry points, cli/main.py, api/routers/__init__.py, router.tsx, docker/compose.yaml, ci.yml) are append-only:
web/src/features/trials/list/**web/src/features/trials/detail/**
Parallel with T-112b.
Definition of Done
Per doc 32 §3 and AGENTS.md §5: lint, format, mypy strict and import-linter green; tests added and passing; docs updated; PR template completed with Closes #<this issue>; Conventional Commit messages referencing T-112a (doc 16 §6); commits authored only by the repository owner identity (AGENTS.md §4); CI green; reviewer checklist (doc 32 §5.1) satisfied.
References
Design docs: doc 13 §3.7 · doc 19 §4
Requirements: FR-DSH-006 (traceability: doc 28)
Metadata
Metadata
Assignees
Labels
Projects
- StatusShow more project fieldsBacklog
Activity
/config.json), SSE client with reconnect/Last-Event-ID and query-cache patching #165