Repository navigation
Description
Task
T-120a· Milestone M10 — Evaluation · Size M · Priority P0 · Epic #10Implements FR-EXP-003 · FR-SIM-003
Branch
spike/t-120a-run-exp-04-on-gazebo— one task = one branch = one PR (doc 32 §6)
Summary
Execute EXP-04 over nights, analyse, confirm at least one interaction failure (×3 confirmation), and record a demo video (gz GUI replay) and MCAP bag; write docs/evidence/EXP-04.md.
Context / motivation
SC-4 real-stack demonstration.
Scope
In scope
- Video stored as release asset (not in git) with link.
Implementation guidance
- Pre-flight: Gazebo nightly green (T-098); RTF and episode times from T-090/T-098 inform the schedule (≈ 22 h compute spread over nights, doc 19 §4).
- Run
exp04_gazebo.yaml(RANDOM vs PROBE, 5 seeds × 80; OFAT once × 30); monitor in the dashboard; follow RB-02 (slow RTF), RB-03 (Nav2 not ACTIVE), RB-04 (orphans). - Analyse modes, confirm interactions on the top modes (
:confirm-interaction) and pick one clear interaction failure for SC-4. - Demo: replay the chosen failure with the Gazebo GUI (doc 17 §6) and screen-record ≤ 2 min; bag + video as release assets, linked from the evidence and README.
- Standards: respect the layering contracts (doc 16 §2) and conventions in doc 34; no hard-coded tunables — thresholds/defaults come from typed settings (doc 27); no magic numbers (ruff
PLR2004); public APIs typed (mypy strict) and documented.
Acceptance criteria
- Evidence doc with interaction-failure case, replay links and video link.
- At least one CONFIRMED interaction failure on Gazebo, or an honest negative result with analysis.
- Video and bag links valid.
- Tests listed below added and green in CI; coverage of new code meets the gate in doc 18 §3.
- Docs, config reference and CHANGELOG
Unreleasedupdated where behaviour, keys or interfaces changed. - Definition of Done (doc 32 §3) satisfied.
Tests required
- N/A.
Dependencies
Blocked by: #205 (T-098), #207 (T-105a)
Blocks: #211 (T-120b), #212 (T-120c), #222 (T-121)
Parallelization notes
Files / paths owned by this task — avoid editing other paths; shared files (pyproject.toml entry points, cli/main.py, api/routers/__init__.py, router.tsx, docker/compose.yaml, ci.yml) are append-only:
docs/evidence/EXP-04.md
Long-running; parallel with T-108, T-125.
Definition of Done
Per doc 32 §3 and AGENTS.md §5: lint, format, mypy strict and import-linter green; tests added and passing; docs updated; PR template completed with Closes #<this issue>; Conventional Commit messages referencing T-120a (doc 16 §6); commits authored only by the repository owner identity (AGENTS.md §4); CI green; reviewer checklist (doc 32 §5.1) satisfied.
References
Design docs: doc 19 §4 · doc 01 §7 · doc 30 §RB-02 · doc 10 §6 · doc 17 §6
Requirements: FR-EXP-003 · FR-SIM-003 (traceability: doc 28)
Metadata
Metadata
Assignees
Labels
Projects
- StatusShow more project fieldsBacklog
Activity
sim-nightly.ymlworkflow #205