Skip to content

[T-123] Release v1.0.0 #224

Open
Open

Description

@CodewithJha

Task T-123 · Milestone M11 — Release 1.0 · Size S · Priority P0 · Epic #11

Implements NFR-DEP-001

Branch chore/t-123-release-v1-0-0 — one task = one branch = one PR (doc 32 §6)

Summary

Follow doc 33 §2 release checklist: main green incl. nightly e2e/sim, CHANGELOG [1.0.0], version bump commit chore(release): v1.0.0, annotated tag, release workflow, verify release assets, announce per doc 26 §13 (announcement copy prepared; posting requires the owner).

Context / motivation

M11 exit: v1.0.0 GitHub Release.

Scope

In scope

  • Release notes with evidence links (SC-1…SC-7).

Implementation guidance

  • Preconditions: all M1–M11 issues closed or explicitly deferred with a v1.1 label; nightly e2e/sim green on the release-candidate commit (doc 33 §2 step 1); the doc 26 §9 go/no-go checklist copied into this issue and ticked.
  • Steps: CHANGELOG [1.0.0] - <date>; bump versions in the three manifests in one commit chore(release): v1.0.0 authored by the repository owner account (no co-author trailers); annotated tag git tag -a v1.0.0 -m "RoboProbe v1.0.0"; pushing the tag triggers release.yml.
  • Verify: the release page has notes, images (ghcr.io/codewithjha/roboprobe-*:1.0.0), SBOMs and the demo report; pull images on a clean machine and run the doc 29 §10 checklist.
  • Draft announcement copy in the issue per doc 26 §13; the owner publishes it.
  • Standards: respect the layering contracts (doc 16 §2) and conventions in doc 34; no hard-coded tunables — thresholds/defaults come from typed settings (doc 27); no magic numbers (ruff PLR2004); public APIs typed (mypy strict) and documented.

Acceptance criteria

  • GitHub Release v1.0.0 exists with images, SBOMs and demo report.
  • Go/no-go checklist (doc 26 §9) ticked in the issue.
  • Release workflow green; assets verified.
  • Docs index (doc 00) version updated.
  • Tests listed below added and green in CI; coverage of new code meets the gate in doc 18 §3.
  • Docs, config reference and CHANGELOG Unreleased updated where behaviour, keys or interfaces changed.
  • Definition of Done (doc 32 §3) satisfied.

Tests required

  • Release workflow.

Dependencies

Blocked by: #223 (T-122)

Blocks: no other task (leaf)

Parallelization notes

Files / paths owned by this task — avoid editing other paths; shared files (pyproject.toml entry points, cli/main.py, api/routers/__init__.py, router.tsx, docker/compose.yaml, ci.yml) are append-only:

  • CHANGELOG.md
  • backend/pyproject.toml
  • web/package.json
  • ros_ws/src/roboprobe_ros/package.xml

Final task.

Definition of Done

Per doc 32 §3 and AGENTS.md §5: lint, format, mypy strict and import-linter green; tests added and passing; docs updated; PR template completed with Closes #<this issue>; Conventional Commit messages referencing T-123 (doc 16 §6); commits authored only by the repository owner identity (AGENTS.md §4); CI green; reviewer checklist (doc 32 §5.1) satisfied.

References

Design docs: doc 33 §2 · doc 26 §9 · doc 26 §13 · doc 29 §10 · doc 00

Requirements: NFR-DEP-001 (traceability: doc 28)

Metadata

Metadata

Assignees

No one assigned

    Labels

    area:deployDocker images, compose, release packagingarea:docsDocumentationmilestone:M11M11 — Release 1.0priority:P0Critical path / blocks otherssize:S<= 1 daytaskChild task of a milestone epictype:choreMaintenance / scaffolding

    Projects

    Relationships

    None yet

    Development

    No branches or pull requests

    Issue actions