Repository navigation
Description
Task
T-123· Milestone M11 — Release 1.0 · Size S · Priority P0 · Epic #11Implements NFR-DEP-001
Branch
chore/t-123-release-v1-0-0— one task = one branch = one PR (doc 32 §6)
Summary
Follow doc 33 §2 release checklist: main green incl. nightly e2e/sim, CHANGELOG [1.0.0], version bump commit chore(release): v1.0.0, annotated tag, release workflow, verify release assets, announce per doc 26 §13 (announcement copy prepared; posting requires the owner).
Context / motivation
M11 exit: v1.0.0 GitHub Release.
Scope
In scope
- Release notes with evidence links (SC-1…SC-7).
Implementation guidance
- Preconditions: all M1–M11 issues closed or explicitly deferred with a
v1.1label; nightly e2e/sim green on the release-candidate commit (doc 33 §2 step 1); the doc 26 §9 go/no-go checklist copied into this issue and ticked. - Steps: CHANGELOG
[1.0.0] - <date>; bump versions in the three manifests in one commitchore(release): v1.0.0authored by the repository owner account (no co-author trailers); annotated taggit tag -a v1.0.0 -m "RoboProbe v1.0.0"; pushing the tag triggers release.yml. - Verify: the release page has notes, images (
ghcr.io/codewithjha/roboprobe-*:1.0.0), SBOMs and the demo report; pull images on a clean machine and run the doc 29 §10 checklist. - Draft announcement copy in the issue per doc 26 §13; the owner publishes it.
- Standards: respect the layering contracts (doc 16 §2) and conventions in doc 34; no hard-coded tunables — thresholds/defaults come from typed settings (doc 27); no magic numbers (ruff
PLR2004); public APIs typed (mypy strict) and documented.
Acceptance criteria
- GitHub Release v1.0.0 exists with images, SBOMs and demo report.
- Go/no-go checklist (doc 26 §9) ticked in the issue.
- Release workflow green; assets verified.
- Docs index (doc 00) version updated.
- Tests listed below added and green in CI; coverage of new code meets the gate in doc 18 §3.
- Docs, config reference and CHANGELOG
Unreleasedupdated where behaviour, keys or interfaces changed. - Definition of Done (doc 32 §3) satisfied.
Tests required
- Release workflow.
Dependencies
Blocked by: #223 (T-122)
Blocks: no other task (leaf)
Parallelization notes
Files / paths owned by this task — avoid editing other paths; shared files (pyproject.toml entry points, cli/main.py, api/routers/__init__.py, router.tsx, docker/compose.yaml, ci.yml) are append-only:
CHANGELOG.mdbackend/pyproject.tomlweb/package.jsonros_ws/src/roboprobe_ros/package.xml
Final task.
Definition of Done
Per doc 32 §3 and AGENTS.md §5: lint, format, mypy strict and import-linter green; tests added and passing; docs updated; PR template completed with Closes #<this issue>; Conventional Commit messages referencing T-123 (doc 16 §6); commits authored only by the repository owner identity (AGENTS.md §4); CI green; reviewer checklist (doc 32 §5.1) satisfied.
References
Design docs: doc 33 §2 · doc 26 §9 · doc 26 §13 · doc 29 §10 · doc 00
Requirements: NFR-DEP-001 (traceability: doc 28)
Metadata
Metadata
Assignees
Labels
Projects
- StatusShow more project fieldsBacklog
Activity