Skip to content

feat(scenario): align warehouse map and Nav2 nominal path (T-092) - #342

Open
Reet24-del wants to merge 3 commits into
mainfrom
feat/T-092-aligned-warehouse
Open

Reet24-del wants to merge 3 commits into
mainfrom
feat/T-092-aligned-warehouse

Conversation

@Reet24-del

Copy link
Copy Markdown
Collaborator

Summary

Use the installed Gazebo warehouse map and a path computed by live Nav2 for the matched warehouse task. The kinematic backend loads the same occupancy geometry and nominal path, so pallet placement follows the same aisle.

Closes #191

Links

Changes

  • Check in the unmodified Nav2 occupancy image, its metadata, an aligned kinematic occupancy clone and the planner output.
  • Switch current warehouse scenarios to the aligned task and retain historical task assets so previous version hashes still resolve.
  • Use the aligned occupancy and route in kinematic materialization, with tests for map and path parity.

Test evidence

  • Live Jazzy Nav2 1.3.14 and Gazebo Harmonic ComputePathToPose returned 867 poses over 13.010 m. Both paths have the same length, the occupied-cell IoU is 1.0, the origin offset is zero cells and the estimated minimum clearance is 2.805 m.
  • 455 targeted backend and scenario tests passed. Ruff and strict mypy passed on the changed Python sources. The comparison CLI passed.
  • Two additional full-drive trials aborted, one on FollowPath acknowledgement and one on a missed collision-monitor heartbeat. The evidence records both results and the successful planner measurement.

Checklist

  • Added map alignment and kinematic backend tests and ran the targeted suite.
  • Updated the design docs, traceability and Unreleased changelog.
  • Kept commit authorship to the repository owner.
  • GitHub checks complete.

Risk & rollback

The aligned task creates a new scenario version. Historic definitions still resolve their original task file. Reverting this PR restores the prior active scenario versions.

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

[T-092] Map, goal pose and nominal path for warehouse_delivery_v1 (resolve TBD_T092)

2 participants