The build of the RAG Modality Swap system model (v1.0, shipped 2026-08-28): re-cutting Databasise's engine (stock LightRAG 1.5.4 + Cozo plugin) into an agnostic machine + fitting contract + versioned components, where a modality (LightRAG, HippoRAG 2, …) is a wiring of components, not a monolith.
docs/system-model/— the frozen v1.0 governing documents, copied verbatim from the model repo (ServerDestroyer/rag-modality-swap-system-model, local:~/Vibe Coding/RAG Graph Vector Raw/.planning/architectures/):SYSTEM-MODEL.md— entry point. §VD verdict (conditional go), §BP the four-rung build ladder, §H1 what this build inherits vs. must decide itself.CONTRACT.md(fitting contract, 20 sections),ANATOMY.md(machine anatomy),PARTS.md(three stress-modality wirings),CATALOG.md(72-system snap-in catalog + porting protocol),RIG.md(comparison rig + versioning).MODEL-RED-TEAM.md— adversarial record.D-VARIANTS/SELECTION.md— governs on any disagreement, including its spike-005 amendment.- Five gate scripts (
*-check.sh, 145 checks),rig-trace.schema.json,wirings/(illustrative wiring JSON),ARCHITECTURE-RUBRIC.md.
.claude/skills/spike-findings-rag-graph-vector-raw/— distilled spike findings (001–005) incl.taint.py(laundering-test validator).v1/— Databasise v1: the sourcerer-lightrag fork (stock LightRAG 1.5.4 +lightrag/kg/cozo_impl.pyCozo plugin, with docker/k8s/webui/tests), extracted from the 2026-06-26 archive and sanitized for public release (root.envremoved; credential values inenv.docker-compose-fullblanked — seeenv.examplefor configuration).reference/hipporag2-2502.14802.pdf— HippoRAG 2 paper.
Not in the repo (local pointers): HippoRAG reference clone at ~/Vibe Coding/RAG Graph Vector Raw/reference/HippoRAG (114MB; re-clone when Phase 4 needs it); the original unsanitized v1 archive at ~/Vibe Coding/Databasise/_archives/sourcerer-lightrag_nonstripped_2026-06-26.tgz (contains live credentials — never commit it). LightRAG code-verified pin: upstream commit b93f7c31f.
- Validator + depth machinery + falsifier gate — Falsifiers 2 (static depth computability) and 5 (per-tier A/A null width) must run and pass here; ladder halts if either fires. Falsifier 8 survey alongside (non-gating).
- LightRAG query-side re-cut in parity — ~794 lines, 17 of 18 node positions, gated on the Phase-1 A/A band.
- Opaque-side admission — LightRAG's ~1,786-line ingest core as
quarantinedopaque node; codebase-memory-mcp whole-engine under §17/§8, run twice (Falsifier 4). - HippoRAG 2 full decomposition + first side-by-side rig run.
Precondition to Phase 1: owner ratification of the §VD verdict (recommended — awaiting owner ratification).
The query side decomposes first; the ingest side stays opaque longest (spike-005 binding order — do not "optimise" this back).