Skip to content

acceptance: DeepSeek V4.1 Flash W8A8 service_reuse on Ascend 910C #602

Open

Description

@lirx-pd

Campaign ID

deepseek-v41-flash-w8a8-service-reuse

Campaign owner. lirx-pd

Optimize DeepSeek V4.1 Flash from the pinned baseline in an isolated workspace. Final acceptance requires more than 10% lower client-visible TPOT in each of C1, C4 and C16 against the fixed initial baseline, the native TPOT gate against the retained references, and same-service GSM8K. Use the approved copies of evaluation assets. Derive each candidate hypothesis from this campaign's profiling and the pinned InferRSI knowledge catalog.

Pinned baseline SHA

9be3c22ab5dade39c0d33d49540ae021ff74bbd1. vLLM-Ascend baseline commit

Pinned candidate SHA

Pending selection. Record each evaluated commit's full SHA. Pin the selected commit in this field before its independent final retest.

RunSpec snapshot

Field RunSpec settings
repo vLLM-Ascend, evaluated by InferRSI in service_reuse mode with --knowledge on
revision Rebuild the pinned baseline in the new workspace. Record each candidate's SHA and comparison parent.
backend Ascend with DSpark (num_speculative_tokens=5) and FULL_DECODE_ONLY graph mode (mode=0, capture sizes 24,48)
device One Ascend 910C node, 8 cards / 16 dies, colocated prefill and decode, TP4 / DP4 / EP16
model DeepSeek V4.1 Flash with the existing Ascend grouped W8A8 target and draft weights
scenario Streaming /v1/completions, C1 / C4 / C16, 8192 input and 1024 generated tokens in each timed wave
timing_scope Client-visible TPOT from receipt of the first complete generated-token SSE frame to HTTP EOF
Serving controls Chunked prefill, prefix caching, max_model_len=153600, block_size=128, per-DP max_num_seqs=8, max_num_batched_tokens=8192, DSA CP and shared expert DP on, FlashComm1 enabled in both configuration and environment, enable_fused_mc2=1 as an integer, and the frozen Jinja template with deepseek_v3 reasoning parser and openai content format

Start a fresh service for the baseline, each evaluated commit and the independent final. Reuse that service within the evaluation across warmup, formal measurement and applicable quality or diagnostic stages. Bind each receipt to its revision, service ID and run ID.

Acceptance criteria source and derivation

  • Source. The user request and the RunSpec snapshot in this issue define the targets, profiling coverage, round cap and elapsed-time limits. At freeze, record the RunSpec SHA-256 and a reviewer-accessible reference in the campaign plan.
  • Derivation. Compute the client-visible TPOT reduction separately for each workload as 100 × (baseline TPOT − evaluated TPOT) / baseline TPOT, using unrounded values. Exactly 10% misses the target. Candidate gains, ranking, and final performance acceptance use only this metric. TTFT and end-to-end request latency are out of scope for performance acceptance. Keep their timestamps as framing diagnostics and limit performance claims to the client-visible metric.
  • A/A calibration and round gates. Measure three independent fresh launches at the pinned baseline SHA with identical settings, token banks, workload order, warmups and timed waves. For each workload, calculate 100 × (max launch TPOT − min launch TPOT) / median launch TPOT. Add 0.5 percentage points to the unrounded spread and round up to the next 0.5-point increment for the regression cap. Add 1 percentage point to that cap for the promotion threshold. These margins use the observed range of three launches. Confirm that the formal evaluation uses comparable conditions before freezing the comparison rules.
  • Fixed initial reference. After A/A, run campaign baseline on a separate fresh service using the formal protocol. Pin that valid baseline run ID and its C1, C4 and C16 samples before the first candidate. Use the A/A samples for noise calibration. Record any baseline restarts before search under the same protocol.
  • Freeze authority. The campaign owner and the designated reviewer and freeze authority review the calibration proposal and execution window. Freeze the A/A protocol before device measurements and the effective comparison rules before candidate search.
Workload Observed A/A spread Maximum round regression against either reference Minimum round gain against the parent
C1 0.194% 1% 2%
C4 0.943% 1.5% 2.5%
C16 2.482% 3% 4%

Gate checklist (frozen before runs)

Search budget and independent final

  • Run at most 20 candidate optimization rounds with --round-mode up_to --rounds 20. Start the outer runner's monotonic clock at authorized campaign execution, before A/A preparation. The 24-hour physical budget includes A/A, the formal baseline and any baseline restarts, candidate work, final and cleanup. End search and finish its cleanup by elapsed hour 23. Reserve the last 1 hour for final and its cleanup. Enforce both cutoffs independently of the controller's profiling credits (--max-minutes 1440 --final-reserve-seconds 3600).
  • Record wall time for admission. Let A be the time elapsed on the outer clock through A/A, B the formal baseline time including any restart and cleanup, and R the estimated wall time of a full candidate round. Include build, startup, sampling, any GSM8K, profiling, analysis and cleanup in R. The search allocation is 1,380 minutes. All 20 rounds fit only if A + B + 20 × R ≤ 1380 min. A/A finished at 90.16 minutes on the outer clock. Record B and a conservative estimate of R before the first candidate. Admit each round only if its work and cleanup fit the remaining search window.
  • Select and pin the final candidate. When the round cap is reached or the next full round cannot fit, read the native controller's best. If it is an eligible candidate under the frozen conditions, pin its attempt ID and full SHA and verify both before invoking campaign final --reason '<limit reached>'. A mismatch blocks launch. A baseline incumbent ends the campaign as INCONCLUSIVE before final admission, including when a candidate passed a round without winning the ranking. Verify the loaded revision in the readiness receipt. Controller selection
  • Independently retest the pinned selection on a fresh service after the SHA check. Require the native TPOT gate using parent_reference_at_acceptance and the fixed initial baseline. At least one workload must meet its promotion threshold against that parent, and each workload must stay within its regression cap against both references. Separately verify >10% lower client-visible TPOT on every workload against the fixed initial baseline. Final reference selection
  • Final quality on the same service. After the native TPOT gate passes, campaign final runs GSM8K on the active final service. Bind the quality receipt to the final revision, service ID and run ID, and require ≥292/300. When comparable TPOT samples miss the native gate, record GSM8K as NOT_RUN and record the performance gate miss. Native quality scheduling

Measurement, quality and diagnostics

  • Freeze the streaming TPOT workload, receipt schema, validator and input hashes under plan/ and validator/ before candidate search. Record the effective settings and resource contention for each attempt.
  • Service sampling for TPOT. Run one warmup wave per workload at 8192/32 and two timed waves at 8192/1024, in C1 → C4 → C16 order. Use the frozen raw-token banks, slot % 4 routing and a unique cache_salt per attempt. Verify token lengths, zero cache hits, zero failed requests and the actual execution path. Separate health checks, startup, readiness, warmup, measurement, profiling, quality and cleanup in the receipts.
  • Client-visible TPOT. Use monotonic client timestamps. Start at receipt of the first complete SSE frame carrying any generated token IDs and end at HTTP EOF. Count every generated token ID, including all IDs in a multi-token first frame. Divide the elapsed milliseconds by the total generated token count minus exactly one. Average request TPOTs within each wave, then take the median of the two wave means for each workload. Retain slow samples and late EOFs.
  • SSE framing evidence. Label the per-request timing receipt client-visible TPOT. Retain the request start, first generated-token frame and EOF timestamps, first-frame token count, and total output token count. Report TTFT and total request duration as diagnostics. The production replay below checks a 20% client-visible TPOT reduction at the same total request duration. Framing review · Timing cross-check
  • Candidate gates. Enable all three TPOT objectives. Require at least one workload to meet its promotion threshold against the current parent's retained samples. Every workload must stay within its regression cap against both the current parent and the fixed initial baseline. Apply the table through the native relative_percent objective fields gain_threshold, parent_regression_limit and cumulative_regression_limit. Verify quality and cleanup before accepting the round. Record the two reference run IDs, one hypothesis, one Harness/Model/Infra plane and any knowledge references per round.
  • Native parent and selection. The formal baseline initializes both comparison_parent and best. A candidate must achieve PASS and beat the incumbent by lower unrounded TPOT in the frozen C16 → C4 → C1 order to advance both references. An exact tie retains the incumbent. A passing candidate that loses the ranking leaves both references in place. The next candidate starts from the resulting comparison_parent. Record the parent and selection attempt IDs and SHAs for each round. Controller settlement
  • L3 quality. Score the fixed GSM8K test subset of 300 questions with AISBench Gsm8kEvaluator. Freeze dataset revision 3101c7d5072418e28b9008a6636bde82a006892c, sampling seed 42 and AISBench revision 5a63d936e40dd04addfcffb2401f84cd0e53bb46. Use gsm8k_gen_0_shot_cot_chat_prompt, thinking/low, temperature 0, top_p=1, request seed 0, C32, zero warmup and the 4096-token output cap. Score each response once, including truncated responses, and require 300 unique successful responses with at least 292 correct. Run candidate quality on the same service after its performance gate passes.
  • Profiling. Capture the baseline and each candidate in a separate diagnostic phase outside timed samples. Record one selected EP per DP before collection and reuse that mapping. Verify the actual request route and rank receipts before using the profile to propose the next candidate.
    • C1 at 8192/32 uses one EP on the actual serving DP.
    • C4 at 8192/32 uses one EP per DP, four total.
    • C16 at 8192/64 uses one EP per DP, four total.

Evidence paths

Path Contents
evidence/deepseek-v41-flash-w8a8-service-reuse/plan/ Frozen RunSpec, environment, comparison rules, authorization and stop conditions
evidence/deepseek-v41-flash-w8a8-service-reuse/results/ Summary and verdict, A/A calibration and formal reference run IDs, complete run and round index, parent and selection decisions, SHA binding and deadline receipts, and versioned artifacts.json archive manifest
evidence/deepseek-v41-flash-w8a8-service-reuse/patch/ Cumulative selected patch or exact revision pointer
evidence/deepseek-v41-flash-w8a8-service-reuse/validator/ Frozen evaluator, input and script hashes, and the offline replay command

Retain every attempt, including rejections, retries and interrupted runs, with sample, quality, profiling and cleanup receipts. Verify the downloaded, approved redacted archive by recomputing key metrics offline from the indexed run and round IDs.

Checks completed before freeze

A/A calibration

Three independent launches at the pinned baseline completed one 8192/32 warmup wave and two 8192/1024 timed waves per workload in C1 → C4 → C16 order. All 126 timed requests completed. The timing receipts reproduce the unrounded aggregates used to calculate the spread. The table shows client-visible TPOT in ms/token to six decimal places.

Workload Launch 1 Launch 2 Launch 3 Cross-launch spread
C1 39.463671 39.540175 39.503708 0.194%
C4 44.238615 44.361700 44.656998 0.943%
C16 56.615988 58.032555 57.082649 2.482%

C16 exceeded the original uniform 1% regression and 2% promotion margins. Each measured spread is below its revised workload-specific regression cap and promotion threshold.

An initial attempt failed native process-group cleanup verification. The outer runner verified cleanup. After correcting worker reaping, all three launches verified native cleanup and all eight cards were idle after A/A. The valid launches took 36 min 33 s. The outer clock recorded 1 h 30 min 10 s including preparation, build and the initial attempt. The calibration receipt retains run and service IDs, per-request timing fields, input hashes and source sample hashes.

Validator and controller rehearsals

  • Production TPOT validator replay. The deployed parser and TPOT gate replayed both synthetic SSE arms. The multi-token first frame retained all 1,024 generated IDs and the same EOF. The exactly-10% case yielded FAIL. A missing workload yielded INCONCLUSIVE, and a missing terminal frame was rejected.
  • Native ranking and final SHA. A synthetic CPU service on InferRSI 214fb400b678db7f03f2d865e3b80c1fbf97d6bd used the retained parent after a lower-ranked PASS and advanced both references on a winning PASS. Final admission refused the baseline incumbent and a mismatched pin. The matching final verified the loaded SHA, distinct initial-baseline and acceptance-parent attempts, and cleanup.
  • Final quality scheduling. The CPU rehearsal used synthetic TPOT values of 100 for the initial baseline, 90 for the acceptance parent, and 85 for the search winner across all workloads. A final value of 89 improved 11% against the initial baseline and 1.11% against the parent. It yielded FAIL on the native TPOT gate with GSM8K NOT_RUN. At 85 the native gate passed and the synthetic quality receipt matched the final measurement's revision, service ID and run ID. Review example
  • Physical deadline. A time-compressed CPU rehearsal used 69 s for the search cutoff and 72 s for the final cutoff. The outer runner stopped and cleaned up search by 68.23 s and final by 71.25 s. It refused another round with 1.32 s of profiling time credited to the native controller.

Verdict

INCONCLUSIVE pending freeze and execution. The pinned final passes only with both TPOT checks, a valid same-service GSM8K score of at least 292/300, and verified revision binding and cleanup. A verified miss of a required gate yields FAIL. If the native TPOT gate fails on complete, comparable samples, the final verdict is FAIL on performance and GSM8K is NOT_RUN. A baseline incumbent at search close or missing or incomparable evidence needed to decide a gate yields INCONCLUSIVE.

Freeze readiness remains INCONCLUSIVE pending reviewer confirmation of the final TPOT and quality policy, the frozen deployment and comparison conditions, and execution authorization. Verify the reader's downloadable replay package before accepting the result. Freeze review

Downstream citation blurb

Candidate <full-candidate-sha> was evaluated against the fixed initial baseline 9be3c22ab5dade39c0d33d49540ae021ff74bbd1, the native TPOT gate using its parent at acceptance, and the same-service GSM8K gate. Verdict <verdict>. Artifacts are indexed in evidence/deepseek-v41-flash-w8a8-service-reuse/results/. Campaign acceptance #602

Pending confirmation

  • Review and authorization. Confirm the independent acceptance reviewer, freeze authority and approved execution window with campaign owner lirx-pd.
  • Deployment identity. Verify Pod Ready, available devices, image digest, vLLM and InferRSI revisions, knowledge catalog, CANN, driver and Python/Torch stack. Record the target and draft weight IDs/revisions and actual serving alias in the authorized plan.
  • A/A, round gates and final acceptance. Confirm and freeze the workload-specific thresholds and the final quality policy before candidate search. Retain the three observed aggregates and their measured timings in the freeze record.
  • Comparison and selection. Confirm which workload objectives can satisfy the round gain gate and approve the proposed ranking. Record candidate SHAs per round and pin the selected full SHA for final.
  • Executable protocol. Freeze the SHA-256 values for the approved input banks, Jinja, fixed GSM8K subset, scorer and validators. Check rank-specific capture and backfill. Bind the campaign deployment to the verified native InferRSI revision.
  • Budget admission. Reconcile the measured A/A time, formal baseline and any restart with conservative candidate-round and final estimates, including cleanup.
  • Archive and review. Confirm the public evidence allowlist, controlled retention for restricted materials, archive owner and versioned download location. Assign the reviewer who will validate the downloaded copy offline.

Activity

  1. added
    kind:acceptanceCampaign acceptance issue: frozen gates + evidence tree; PASS/FAIL/INCONCLUSIVE
    on Nov 23, 2026
  2. changed the title [-]acceptance: <campaign-name>[/-] [+]acceptance: DeepSeek V4.1 Flash W8A8 service_reuse on Ascend 910C[/+] on Nov 23, 2026
  3. added
    area:harnessHarness module: profile, A/B loop, quality gates, evidence reports
    on Nov 23, 2026
  4. david6666666 commented on Nov 23, 2026

    @david6666666
    Collaborator

    Before freezing the 1% regression and 2% promotion gates, could we add baseline A/A measurements across independent fresh launches with the same token banks and wave order? Same-service repeats miss restart-to-restart spread. Please retain that spread per workload and define how to handle an apparent gain inside it. A useful dry run for the existing stop test is a trigger SHA different from the retained incumbent: assert which SHA campaign final will actually start before consuming the reserve, and enforce the physical deadline separately from the controller clock.

  5. zengchuang-hw commented on Nov 23, 2026

    @zengchuang-hw
    Contributor

    NO PASS(冻结就绪度;不是实验结果)
    dot, acting for @zengchuang-hw

    已核实 vLLM-Ascend 基线提交 存在。每档 C1/C4/C16 均须 >10%、GSM8K ≥292/300,以及固定初始基线与轮次父版本分开记录,这几个口径可保留。冻结前先跑通两项:

    1. 把触发 SHA 和 final 启动 SHA 绑定。 当前 main 的 final 路径 从 state["best"] 选 revision;--reason 只是原因,不是选定 SHA。如果触发停止的 SHA 与 incumbent 不同,不能只记录 stop reason 就启动。用你计划的双 SHA 演练,验证不一致时先拒绝启动;冻结一个能让 final 实际使用触发 SHA 的受支持流程。
    2. 用独立物理时钟执行 12 小时上限。 控制器服务期限 会加回 profiling 开销。让外层运行器用不加回 credit 的时钟截止搜索、保留最后 1 小时,并提前演练到点停止和清理。冻结时明确这 12 小时是否包含 A/A 和重新启动的基线;两阶段比较都要说清用哪组基线样本。

    这次只核对了 GitHub 提交和控制器源码,没启动服务、硬件或 CI。执行授权、A/A 冻结和可下载回放证据尚未落实,实验结论仍是 INCONCLUSIVE。

  6. Dong1017 commented on Nov 23, 2026

    @Dong1017
    Collaborator

    Posted by Dong-bot, an automated agent acting on behalf of @Dong1017 (always-on-bot, model claude-sonnet-5-5).

    Triage: #602 is a well-specified acceptance campaign, but it is not ready to run. It needs a >10% TPOT cut at C1, C4 and C16 plus GSM8K ≥292/300. Both blocking dry runs, the owner and reviewer, the execution window and the A/A policy are still open.

    Blockers (from the body's "Pending confirmation"):

    1. No named campaign owner, independent reviewer, freeze authority or iTASK window.
    2. The A/A launch count, spread statistic and in-noise rule are unfrozen. The 1% and 2% gates depend on them.
    3. The final-SHA dry run (a mismatch must refuse launch) and the deadline dry run (hour-11 cutoff and final reserve, profiling credits on) are not done.
    4. Deployment identity, input and validator SHA-256 values, and the archive owner and allowlist are unconfirmed.

    Gaps:

    • Round cap vs budget: 20 rounds likely doesn't fit in 12h. State the per-round and A/A wall time.
    • Failed final retest: the body doesn't say what happens if the early-stop candidate misses the independent final. Freeze one outcome: FAIL, INCONCLUSIVE, or the next-ranked candidate.
    • Ranking: the ranking used when the cap ends the search is undefined.
    • TPOT definition: say how SSE frames carrying several speculative tokens are counted.

    Next step: the owner names the seats, then A/A policy, then the two dry runs, then freeze. The body has no @Dong1017 ask, so Dong-bot (authorized delegate) records no acceptance here.

    Details

    I read the issue body only. I did not open the linked controller code or the readiness comment, and nothing was executed.

    The configuration arithmetic is consistent:

    • TP4×DP4 gives 16 dies.
    • Per-DP max_num_seqs=8 × 4 DPs = 32 ≥ C16.
    • 6 tokens per sequence (5 speculative + 1) × 4 = 24 and × 8 = 48, which matches the 24,48 capture sizes.

    Each round needs a restart, a W8A8 load, perf, GSM8K at C32 with a 4096-token cap, and profiling, which is why 20 rounds is doubtful in 12h.

    --max-minutes 720 and --final-reserve-seconds 3600 match the hour-11 search cutoff. Keep the exact-10% boundary test and the missing-evidence path in the dry-run set.

  7. Dong1017 commented on Nov 23, 2026

    @Dong1017
    Collaborator

    Not accepted. deepseek-v41-flash-w8a8-service-reuse stays INCONCLUSIVE. Freeze readiness stays NO PASS.

    The issue body leaves verdict INCONCLUSIVE until freeze and execution. @zengchuang-hw (comment 7092773215) already withheld freeze readiness: bind the early-stop trigger SHA to the revision campaign final actually launches (mismatch must refuse start; state["best"] plus --reason is not that binding), and enforce the 12h physical clock with the last hour reserved, independent of controller profiling credits. Both dry runs are still unchecked. No result is accepted.

    Still open (body “Pending confirmation”):

    1. Campaign owner, independent acceptance reviewer, freeze authority, and the iTASK window are unnamed.
    2. A/A fresh-launch count, per-workload spread statistic, and the in-spread gain rule are unfrozen. The 1% regression and 2% promotion gates wait on that calibration.
    3. Final-SHA dry run and deadline dry run (profiling credits on; search cleanup by hour 11; final reserve 3600s) are not done.
    4. Deployment identity, input/Jinja/GSM8K/scorer/validator SHA-256, archive owner, allowlist, and offline reviewer are unconfirmed.

    Still unspecified in the frozen rules:

    • Per-round and A/A wall time against the 20-round cap inside 12h (each round is a fresh service, W8A8 load, L4, GSM8K at C32, and a separate profile).
    • Outcome when the early-stop SHA misses the independent final (FAIL, INCONCLUSIVE, or next-ranked eligible candidate).
    • Ranking when the round cap or hour-11 cutoff ends search before a PASS.
    • TPOT when one SSE frame carries several speculative token IDs (current rule: first frame that contains a generated token ID → HTTP EOF, divided by output_tokens − 1).

    Gates that can stay: >10% TPOT on each of C1, C4, and C16 versus the fixed initial baseline (exactly 10% misses), GSM8K ≥292/300, and parent vs initial-baseline samples kept separate. Baseline pin remains 9be3c22ab5dade39c0d33d49540ae021ff74bbd1.

    Next step: name the seats, freeze A/A policy, pass both dry runs, then freeze. Dong-bot (authorized delegate) records no campaign acceptance on this mention.

    Not verified here: controller source beyond the line ranges cited in the thread, no service, hardware, or dry run executed.

  8. lirx-pd commented on Nov 23, 2026

    @lirx-pd
    ContributorAuthor

    Thanks for the reviews. The revised plan removes performance-triggered early stopping. Search ends at the 20-round cap or when another full round, including cleanup, cannot fit in the search window. We then pin one candidate for independent final evaluation.

    • Ownership and authorization. lirx-pd is the campaign owner. Before execution, record the independent reviewer, who can approve the freeze, and the authorized execution window. Pin the deployment configuration, model and runtime revisions, and SHA-256 values for the input banks, Jinja template, GSM8K subset, scorer, and validators.
    • A/A calibration. The draft proposes three independent launches of the pinned baseline with identical token banks, warmups, and wave order. Compute 100 × (max TPOT − min TPOT) / median TPOT across launches for each workload. A gain at or below that spread is INCONCLUSIVE for promotion. A fresh confirmation must clear both the spread and the existing gates. Use the measured spread to check whether the 1% regression and 2% promotion gates are resolvable before freezing them. Then measure a separate formal baseline and record both its run ID and each round’s parent run ID.
    • Budget and deadline dry run. The 24-hour physical budget includes A/A, the formal baseline and any restarts, candidate work, and cleanup. An outer monotonic clock enforces 23 hours for search and cleanup and 1 hour reserved for final and cleanup. Record the A/A and baseline durations and a conservative estimate for a full round, including startup, measurement, quality, profiling, and cleanup. All 20 rounds fit only if those costs total at most 1,380 minutes before final. The dry run will exercise both cutoffs and verify cleanup with controller profiling credits enabled.
    • Ranking and final SHA dry run. Rank eligible PASS candidates by lower unrounded TPOT in C16 → C4 → C1 order, retaining the incumbent on an exact tie. Pin the selected attempt and SHA, then verify the SHA against the controller’s selection before campaign final. The dry run will verify that a mismatched SHA blocks startup and that a matching SHA is confirmed in the service readiness receipt.
    • Final verdict. Use the one pinned independent final for acceptance. Each workload must improve by strictly more than 10% against the fixed initial baseline, with GSM8K ≥292/300. Complete, comparable evidence that misses a gate yields FAIL. No eligible candidate or missing or incomparable required evidence yields INCONCLUSIVE.
    • TPOT for multi-token SSE frames. Measure from receipt of the first complete frame carrying generated token IDs to HTTP EOF. Count every generated ID, including all IDs in the first frame, and divide by the total generated token count minus exactly one. The validator checks will cover a multi-token first frame, exactly 10% improvement, and missing evidence.
    • Evidence delivery. Confirm the archive owner, public allowlist, and offline reviewer. For acceptance, record the versioned download and checksum, then have the reviewer recompute the key metrics from the downloaded redacted archive offline.

    Both dry runs and execution authorization are pending. The campaign verdict remains INCONCLUSIVE.

  9. zengchuang-hw commented on Nov 23, 2026

    @zengchuang-hw
    Contributor

    NO PASS(冻结就绪度;不是实验结果)
    dot, acting for @zengchuang-hw

    修订方案 已移除性能早停,明确 C16 → C4 → C1 排名与 SHA 不符时拒绝启动,并把 A/A、基线和清理纳入外层 24 小时时钟。上轮两项设计缺口已有方案;两次演练和执行窗口仍未确认,这不等于已授权使用 24 小时。

    冻结前还有一处协议与实现不一致。 正文要求每个通过并清理完成的候选都成为下一轮父版本,但当前控制器先判断它是否赢得排名,只有赢了才同时更新 incumbent 和 comparison parent。例如,C4 达到轮次增益但优先级更高的 C16 略退、仍在回退限内,候选可以 PASS 却不换父版本。请明确采用现有“排名胜者为父版本”,或另行设计并验证分离两者;演练覆盖这种 PASS 未入选,并保证噪声区内待确认的候选不提前推进父版本。最终启动前也应确认选中的是候选而非基线;无合资格候选时保留 INCONCLUSIVE。

    静态核对了修订正文、评分和状态更新;未执行演练、设备或 CI。

  10. david6666666 commented on Nov 23, 2026

    @david6666666
    Collaborator

    Could the final validator separate a client-visible TPOT win from a change in SSE batching? The proposed clock starts when the first complete token-bearing frame arrives but the denominator still counts every token in that frame except one. If the candidate buffers more tokens into its first frame, the measured TPOT can fall while TTFT grows and EOF stays unchanged. Add a paired fixture with identical token IDs and EOF but different first-frame grouping; retain TTFT, first-frame token count, and end-to-end time for each arm so a transport-only change cannot be mistaken for faster decode. If the >10% gate is intentionally client-visible TPOT only, label it that way in the receipt.

  11. zengchuang-hw commented on Nov 23, 2026

    @zengchuang-hw
    Contributor

    NO PASS(计时口径补充,非实验结果)
    dot, acting for @zengchuang-hw

    针对 SSE 分帧问题,我按本 Issue 的公式独立复算了一个等 token、等 EOF 的例子:两臂都从请求开始计时,均在 1,100 ms 到 EOF,生成 1,024 个相同 ID。若首个含 token 的完整帧仅因缓冲从 100 ms 延后到 300 ms,公式就从 1,000/1,023 降到 800/1,023 ms/token,看起来改善 20%,但 TTFT 变差,端到端没有改善。这个信号不能单独当作解码加速。

    冻结前建议加分帧对照,并逐请求保留 TTFT、首帧 token 数、EOF 时刻和总 token 数。若目标确实只验收这个客户端可见指标,按该口径命名并冻结 TTFT/端到端如何处理;若要声称解码变快,控制分帧策略或另取能区分传输与生成的证据。此前的父版本规则和两次演练仍待对齐。此处只做了公式核算,未运行 validator 或服务。

  12. lirx-pd commented on Nov 23, 2026

    @lirx-pd
    ContributorAuthor

    Thanks for flagging the SSE framing effect. The revised performance gate uses client-visible TPOT only. C1, C4, and C16 must each improve by more than 10% against the fixed initial baseline. TPOT is measured from receipt of the first complete SSE frame carrying generated token IDs to HTTP EOF, divided by the total generated token count minus one.

    The standalone paired fixture reproduced the effect with the same 1,024 token IDs and the same 1,100 ms HTTP EOF. Buffering eight tokens into the first frame moved its arrival from 100 ms to 300 ms and reduced measured TPOT from 0.9775 to 0.7820 ms/token. This confirms that the metric is sensitive to stream framing, so we’ll label results as client-visible TPOT. We’ll retain TTFT, first-frame token count, EOF timestamp, total output tokens, and total request duration as diagnostics. TTFT and end-to-end latency are outside the performance acceptance criteria.

    The plan also adopts native InferRSI selection. A candidate advances both the comparison parent and best only when it passes and wins the ranking. Before freeze, we’ll replay the framing fixture through the production validator and complete the final SHA and physical deadline dry runs. The campaign verdict remains INCONCLUSIVE.

  13. zengchuang-hw commented on Nov 23, 2026

    @zengchuang-hw
    Contributor

    NO PASS(冻结就绪度;不是实验结果)
    dot, acting for @zengchuang-hw

    本轮修订 已把两处设计对齐:正文明确只有排名胜出的 PASS 才更新 comparison_parent 和 best;验收限定为每档 C1/C4/C16 的客户端可见 TPOT 严格改善 >10%,TTFT 和端到端只作诊断。按给出的时间与 token 数独立复算,1,000/1,023 → 800/1,023 ms/token 确是 20% 改善,即使 EOF 和生成序列不变。因此,最终报告可以说达到该客户端指标,但仅凭这一数字不能说解码更快或请求更快。

    冻结前仍需证据:用生产 validator 重放同组 SSE 对照(含首帧多 token、恰好 10% 与缺证据三条路径),完成 A/A 校准、原生排名与 final SHA 绑定、物理截止与清理演练,并另行确认执行授权。当前维持 INCONCLUSIVE。本轮核对了更新后的正文并复算公式,没有运行 validator、服务或设备。

  14. lirx-pd commented on Nov 23, 2026

    @lirx-pd
    ContributorAuthor
    Thanks for the review. We completed three independent baseline launches and recomputed client-visible TPOT from 126 timed requests. The initial attempt failed the native cleanup check. After fixing worker reaping, all three fresh launches passed cleanup verification.
    
    The revised draft sets per-workload round gates from the measured A/A spread.
    
    | Workload | A/A spread | Maximum regression | Minimum promotion gain |
    |---|---:|---:|---:|
    | C1 | 0.194% | 1% | 2% |
    | C4 | 0.943% | 1.5% | 2.5% |
    | C16 | 2.482% | 3% | 4% |
    
    Each regression cap is the unrounded spread plus 0.5 percentage points, rounded up to the next half-point increment. The promotion threshold is one percentage point higher. Every workload must stay within its cap against both the current parent and the fixed initial baseline. At least one workload must meet its promotion threshold against the parent. A `PASS` advances `comparison_parent` and `best` only if it wins the native C16 → C4 → C1 ranking.
    
    - The production validator replay covered the multi-token SSE first frame, exactly 10% improvement yielding `FAIL`, and missing evidence yielding `INCONCLUSIVE`.
    - The native CPU rehearsal verified that a baseline incumbent or mismatched SHA blocks final startup. A matching pin verified the loaded SHA and both comparison references.
    - The time-compressed deadline rehearsal verified search and final cleanup before their respective cutoffs, with profiling credits enabled.
    
    The independent final requires **strictly more than 10% client-visible TPOT improvement on each workload** and **GSM8K ≥292/300**. Freeze readiness and the campaign verdict remain `INCONCLUSIVE` pending review of the revised gates and separate execution authorization.
  15. zengchuang-hw commented on Nov 23, 2026

    @zengchuang-hw
    Contributor

    NO PASS(冻结就绪度;不是实验结果)
    dot, acting for @zengchuang-hw

    核对了本轮证据。按公布的三位小数复算,C1/C4/C16 的 A/A spread 约为 0.192% / 0.942% / 2.482%,得到相同的回退上限 1% / 1.5% / 3% 和晋升门槛 2% / 2.5% / 4%。126 个请求也与 3 次启动 × 2 波 × (1+4+16) 一致。原生轮次门槛支持同时约束两个参考,并要求至少一个负载达到晋升门槛。SSE、SHA 与截止清理演练是作者提供的结果,我未独立重放。

    冻结前需明确 final 怎样取得质量结果。 final加载选中轮次留存的父参考;service_reuse仍先跑父参考晋升门槛,未达标就跳过 GSM8K。例:三档初始基线均为 100,晋升时父参考 90,搜索赢家 85;新服务 final 测到 89,较初始基线改善 11%,却只比父参考改善 1.11%,三档均未达到轮次晋升门槛,GSM8K 不会运行。请冻结一个受支持、在同一 final 服务上仍能运行所需质量检查的路径并演练;或者明确将父参考门槛也纳入最终验收。未执行的 GSM8K 不等于通过或实测失败。

    最终执行仍待授权,结果维持 INCONCLUSIVE。本轮仅做源码核对和算术复核,未启动服务、设备或 CI。

  16. lirx-pd commented on Nov 23, 2026

    @lirx-pd
    ContributorAuthor

    Thanks for catching the final quality dependency. The revised RunSpec and issue draft make the native TPOT gate part of final acceptance. The final must meet at least one workload’s promotion threshold against the parent retained at candidate acceptance, stay within all regression caps against both references, and improve client-visible TPOT by more than 10% on each workload against the fixed initial baseline. Once the native TPOT gate passes, campaign final runs GSM8K on that same service and requires ≥292/300.

    We rehearsed both paths on the pinned controller. In the review example, a final TPOT of 89 improved 11% against the initial baseline of 100 and 1.11% against the retained parent of 90. The final verdict was FAIL on performance, and GSM8K was recorded as NOT_RUN. With a final TPOT of 85, the native gate passed and the synthetic quality receipt matched the final measurement’s revision, run ID, and service ID.

    The campaign verdict is INCONCLUSIVE pending freeze approval and execution authorization.

  17. zengchuang-hw commented on Nov 23, 2026

    @zengchuang-hw
    Contributor

    PASS
    dot, acting for @zengchuang-hw

    通过的是本轮 final 验收协议修订,不是冻结批准、运行授权或实验结果。正文现将原生父参考门槛明确列为 final 的必要条件,再单独要求相对固定初始基线的三档 TPOT 均改善 >10%,并在同一服务完成 GSM8K ≥292/300。与上轮指出的实际运行路径一致。

    独立复算:89 相对 100 改善 11%,但相对 90 只改善约 1.11%,因此 (按正文使用完整可比数据时) 原生性能门槛 FAIL,GSM8K 记 NOT_RUN;85 相对两组参考分别改善 15% 和约 5.56%,可进入质量阶段。作者的 CPU 演练可说明分支和 receipt 绑定,合成质量结果不是实际 GSM8K 通过。

    冻结仍需确认指定审批人和执行授权、部署和比较配置、预算,以及可下载回放证据。实际 campaign 维持 INCONCLUSIVE。本轮只核对正文与源码并复算,未运行服务、硬件或 CI。

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Metadata

Metadata

Assignees

No one assigned

    Labels

    area:harnessHarness module: profile, A/B loop, quality gates, evidence reportskind:acceptanceCampaign acceptance issue: frozen gates + evidence tree; PASS/FAIL/INCONCLUSIVE

    Type

    No type

    Projects

    No projects

      Milestone

      No milestone

      Relationships

      None yet

      Development

      No branches or pull requests

      Issue actions