Repository navigation
Description
The issue model needs a dedicated OKF subtree so agents can navigate from a small index to process guidance or the body rules for one native issue type without loading a monolithic format page.
Request
Create the Ways-of-Working/Issues/ section by relocating the existing issue guidance atomically, then add separate process and type pages. Preserve green navigation and links at every step.
Acceptance criteria
Issues/index.mdroutes readers into Process and Types subtrees- Process contains concise Format, Lifecycle, Planning, and Relationships pages
- Types contains a concise Hierarchy overview plus Epic, PBI, Task, and Bug pages
- Every page has
titleanddescriptionfrontmatter and one clear conceptual owner - Existing Issue Format and Issue Hierarchy content is relocated without broken inbound links, anchors, navigation, or generated indexes
- Workflow remains authoritative for phase definitions
- Sub-issues, dependencies, and parallelism have one canonical explanation
- The four native operational issue types have distinct, non-duplicative body and lifecycle guidance
- All child pull requests pass index, link, lint, clean-build, CI, and Copilot review gates
Technical decisions
Structure: Process and Types are separate indexed subtrees so their child Tasks can proceed independently after the atomic relocation.
Atomic relocation: Moving the existing pages, navigation entries, generated indexes, and every inbound reference is one Task and one pull request. No compatibility stubs remain.
Parallel content: After relocation, Process content and Types content touch separate subtrees and may execute in parallel.
Small pages: Each page states one concept once and links outward rather than copying Workflow or another type page.
Delivery plan
Delivery is tracked through native Task sub-issues. Relocation completes first; Process and Types content then proceed as dependency-free siblings and may run concurrently.
Activity
MariusStorhaug commentedon Jul 25, 2026
Created the OKF-section child graph. Relocation Task #89 runs first. Process Task #88 and Types Task #87 are siblings blocked by #89 and may run in parallel after it completes. Their separate Process and Types subtrees avoid shared-file conflicts; both must complete before parent Task #86 aligns consuming guidance.
MariusStorhaug commentedon Jul 25, 2026
Execution started for relocation Task #89 after bootstrap #82 closed. Its coordinated session is implementing only the atomic OKF path/navigation cutover. Process #88 and Types #87 remain blocked and will start in parallel only after #89 merges.
MariusStorhaug commentedon Jul 25, 2026
Relocation PR #91 is ready, green, Copilot-clean, and squash auto-merge enabled. Independent approval is the only remaining gate. Process Task #88 and Types Task #87 remain correctly blocked; both coordinated sessions will start from the post-merge live default branch, in parallel, after #89 closes.
MariusStorhaug commentedon Jul 25, 2026
Relocation #89 is complete. Types #87 and Process #88 are now executing in parallel from live
main. #87 exclusively ownsIssues/Types/; #88 exclusively ownsIssues/Process/; each may make only its own subsection change in shared Zensical navigation. Their completion will unblock #86.MariusStorhaug commentedon Jul 25, 2026
PR #93 for Types #87 is ready, green, Copilot-clean, and awaiting only independent approval. Its merge will provide the four canonical type pages and corrected Hierarchy semantics required to unblock Process PR #94.
MariusStorhaug commentedon Jul 25, 2026
Source-of-truth synchronization is complete: PR #93 head
6d48368contains every Types-owned correction found during combined PR #94 review, and PR #94 includes that exact head. #93 is green/clean and approval-blocked; #94 remains draft pending #93 merge and final Process-only reconciliation.MariusStorhaug commentedon Jul 25, 2026
Delivery consolidated by direct user instruction: PR #93 is closed without merge, and draft PR #94 contains the complete final Types and Process trees and closes both #87 and #88. Verified Types-tree parity means no #87 work is missing. The former #87 -> #88 serialization edge is obsolete and removed; #94 remains draft until its final checklist and gates complete.
MariusStorhaug commentedon Jul 26, 2026
Aggregate completion verified. All three child Tasks are closed: relocation #89 via PR #91 and combined Types/Process #87/#88 via PR #94. Squash
f156c3658969b03250c8af79a452649106aa5df3is live onorigin/main; post-merge workflow https://github.com/MSXOrg/docs/actions/runs/30180399670 passed Build, Links, Lint, and Publish. The Issues/Process and Issues/Types subtrees, frontmatter, navigation, generated indexes, canonical relationship guidance, distinct type pages, and review gates satisfy this PBI acceptance criteria.MariusStorhaug commentedon Jul 26, 2026
Closing this PBI after verified 3/3 child completion and successful aggregate post-merge validation.