Skip to content

App Platform Phase 5: add connected grant foundation - #278

Merged
Maneek21 merged 5 commits into
masterfrom
codex/app-platform-phase5-foundation
Aug 31, 2026
Merged

App Platform Phase 5: add connected grant foundation#278
Maneek21 merged 5 commits into
masterfrom
codex/app-platform-phase5-foundation

Conversation

@Maneek21

Copy link
Copy Markdown
Owner

Summary

  • freeze the Phase 5 connected App Protocol v1 proof contracts
  • persist requested grants, dependency locks, provider snapshots, and dormant action bindings with tenant-bound database lineage
  • preserve Protocol v0 compatibility and keep App-origin execution denied

Validation

  • focused App Kit, grant, connector, database, upgrade, and architecture tests
  • fresh disposable PostgreSQL schema and ordered extras through migration .23
  • API typecheck

Local PostgreSQL uses the documented test-only vector shim because pgvector is not installed. Real-pgvector release-host certification remains Phase 5 Loop 7.

@Maneek21
Maneek21 merged commit 2974562 into master Aug 31, 2026
10 checks passed
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant