Objective. Run the release certification checklist end to end against a named candidate SHA, and record a receipt — before any release is published.
Why. Every gate in the release program answers a piece of the question "is this artifact safe to publish?". None of them answers it jointly. A green Linux build, a green web smoke, a present SBOM, and a written release note are four separate facts; certification is the act of confirming they all describe the same candidate. Certification is also the last point at which a problem is cheap to fix, and the point at which publishing is authorized — so it must be a recorded artifact, not a state of mind held by whoever ran the build.
The checklist. All of the following must hold against one exact candidate SHA:
- The full gate is green on that SHA.
- Every artifact in the release matrix is built from that SHA.
- Each artifact is launched on its own platform, and the launch result is recorded — including the DEB's clean-install verification on Debian 12 (
packaging/deb/verify-install.sh). - Checksums are present for every artifact.
- The SBOM and provenance statement exist for every artifact (issue RP-06: supply-chain metadata — SBOM, provenance, signatures #32).
- The release notes are written for that SHA.
- The maintainer's explicit approval is recorded.
Work
- Run the checklist end to end against a named candidate and record a receipt: the SHA, the artifact set with hashes and sizes, the per-platform launch results, and the approval reference.
- Record which failure shapes remain untested — explicitly, by name. The release program's known gaps are tracked in
docs/GAPS.md; the receipt must state which of them bear on the candidate. "All green" without an untested-shapes section is a false claim of completeness, because a per-platform build receipt proves that platform's artifact launches, not that every failure mode was exercised. - Keep the certification receipt in the release documentation so it is auditable after the fact.
Acceptance
- A receipt exists naming the candidate SHA, the artifact set (hashes and sizes), the platform launch results, and the approval.
- The receipt names the untested failure shapes that bear on the candidate.
- Every checklist item is answered from the authoritative store — the job's own status rows, the artifacts on disk — not from a watcher's output or a remembered run.
- The receipt is stored in the release documentation, not only in chat.
Boundaries. Certification authorizes a release; it does not perform one. Production publication, tagging, and signing remain gated for explicit maintainer approval.
Tracking: task #178; campaign RP-08.
Next action (owner: release). Assemble the checklist as a single runnable artifact — a script that gathers each item's evidence from the authoritative store and emits the receipt. The receipt should be machine-produced, so that it cannot differ from the evidence it cites.
Activity
aliasfoxkde commentedon Nov 10, 2026
Tracked as T27-60 and T27-61 in the release ledger; this issue carries it.
aliasfoxkde commentedon Nov 10, 2026
Status: NOT STARTED
Landed: the checklist's evidence baseline exists —
docs/release/PHASE-0-AUDIT.md(onmainvia PR #16) — and the certification report's required contents are enumerated in the board's T27-60 row.Still outstanding: no artifact has reached
CERTIFIED. No candidate SHA has green gates, artifacts have not been built and launched on their own platforms, and no maintainer approval exists — the scope approval is still open (#43) and publication authorization is still open (board row T27-61).Next: the certification report (T27-60) cannot be written until the platform receipts exist (#31, #96) and the test-tag rehearsal passes (#99). Owner: release engineering, with the maintainer for authorization.
aliasfoxkde commentedon Nov 11, 2026
Campaign fields (appended 2026-11-11)
Outcome — A reader can point to one certification receipt naming the exact candidate SHA, the artifact set built from it, each platform's launch result, and the maintainer's approval.
Objective — Run the certification checklist end to end against a candidate SHA and record a receipt that names that SHA, the artifact set, the platform launch results, and the approval; record which failure shapes remain untested.
Stopping condition — A certification report exists in
docs/release/for the candidate SHA, every artifact in the set is marked CERTIFIED with a stored platform receipt behind it, and the untested failure shapes are listed.Verification — The certification report is on
mainat the candidate SHA and each artifact row cites a stored receipt (a launch or install result), not a health check; the scope approval (#43) and the publication authorization (ledger row T27-61) are recorded against the same SHA.Status — NOT STARTED
Tracking: task #178; campaign RP-08; ledger rows T27-60, T27-61.
Defects: B-13, B-21.
aliasfoxkde commentedon Nov 24, 2026
Addressed: final release certification tracked in consolidated PR #186