Skip to content

Keep complete V master toolchain in CI - #20

Merged
antono3 merged 1 commit into
masterfrom
codex/complete-v-master-toolchain
Sep 8, 2026
Merged

Keep complete V master toolchain in CI#20
antono3 merged 1 commit into
masterfrom
codex/complete-v-master-toolchain

Conversation

@antono3

@antono3 antono3 commented Sep 8, 2026

Copy link
Copy Markdown
Collaborator

Summary

  • retain setup-v-action for the supported V 0.5.2 matrix entries
  • build the advisory Linux V-master entry from an official shallow source checkout
  • keep the v1_fallback executable required by current V-master tool commands such as v test
  • preserve advisory failure handling for the moving master branch

Context

Current V master splits compatibility work into a separate v1_fallback binary. setup-v-action@v4 packages a reduced toolchain that omits it, causing the Vulkan v test ergonomic step to fail before testing this repository. The same direct-source setup has passed the complete OpenCL V-master test lane.

Verification

  • workflow YAML parsed successfully with Ruby Psych
  • git diff --check

@antono3
antono3 merged commit ac401dd into master Sep 8, 2026
7 checks passed
@antono3
antono3 deleted the codex/complete-v-master-toolchain branch September 8, 2026 22:42
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

2 participants