Skip to content

Move the reader articles to the cryptnox-readers repo - #18

Merged
embarquech merged 2 commits into
mainfrom
docs/move-reader-docs
Sep 11, 2026
Merged

embarquech merged 2 commits into
mainfrom
docs/move-reader-docs

Conversation

@mmlado

@mmlado mmlado commented Sep 4, 2026

Copy link
Copy Markdown
Collaborator

The three reader articles (reader-compatibility, fido2-compatibility, click-to-tap) have moved to their own repository and are published at docs.cryptnox.com/cryptnox-readers/ with a combined PDF.

This PR removes the article sources from the hub and repoints everything at the new site. The Smart Card Readers card on the landing page keeps its icon and description and now carries a single HTML + PDF entry, matching the other product cards. Redirect stubs at the three old root URLs (meta refresh plus canonical) forward readers and search engines to the new locations. sitemap-docs.xml drops the old article URLs and adds the new site and PDF, robots.txt lists the new site's sitemap, and llms.txt links are repointed.

The README documentation table also gains the previously missing sdk-esp32, sdk-arduino and sdk-cpp rows, plus a row for the new cryptnox-readers repo; the sub-path mapping and related-repositories list are extended to match.

Do not merge before: the cryptnox-readers import PR is approved and merged, the repository is moved into the cryptnox org, and GitHub Pages is enabled on it (GitHub Actions as source) — until then the links in this PR point at a site that does not resolve.

Verified locally: sphinx-build -W clean, redirect stubs land at the site root.

🤖 Generated with Claude Code

The three reader articles (reader-compatibility, fido2-compatibility,
click-to-tap) now live at docs.cryptnox.com/cryptnox-readers/. The
Smart Card Readers card links the new site and its PDF; redirect stubs
at the old root URLs forward readers and search engines; sitemap,
robots and llms indexes updated. The README documentation table gains
the missing sdk-esp32, sdk-arduino and sdk-cpp rows and the new
readers repo.

Co-Authored-By: Claude Fable 5 <noreply@anthropic.com>
@embarquech
embarquech merged commit b5d53bc into main Sep 11, 2026
2 checks passed
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

2 participants