cpp-critical-path-validator produces findings that are meant to be relied on when judging whether a schedule's critical path is real, and its checks come out of court-facing forensic work. Any defect that could mislead a court is therefore treated as release-blocking here, whether or not it is a security defect in the conventional sense.
Thank you for taking the time to report.
| Version | Supported |
|---|---|
| 0.1.x | Yes |
| < 0.1 | No |
The validator ships as cpp-critical-path-validator on GitHub. The most recent published version is always the supported reference; back-ports of security fixes to prior 0.1.x point releases are made on a best-effort basis.
Do not open a public GitHub issue for a suspected vulnerability.
Email hello@criticalpathpartners.ca with the word SECURITY in the subject line. Include:
- A description of the issue
- A minimal reproduction (validator version, Python version, OS, snippet, input)
- The forensic / operational impact you believe it has
- Whether you intend to publicly disclose, and on what timeline
You should expect an initial acknowledgement within 72 hours. A confirmed vulnerability will receive a triage plan within 7 days and a fix or mitigation timeline shortly after.
We will credit reporters in the release notes unless you ask to remain anonymous.
- Forensic-correctness math bug that could mislead a court. Wrong critical-path identification, wrong CPLI / BEI / float-saturation computations, wrong constraint-driven-criticality classifications, missing or mis-fired LPM-confirmed-false-CP detections, DCMA-14 thresholds applied to the wrong profile, missing or wrong Daubert disclosures. The validator's whole value proposition is courtroom defensibility — these defects rank above conventional security bugs.
- Information disclosure. Leakage of XER paths or contents through error messages, leakage of customer-supplied schedule data through caches or logs, file-enumeration through user input on the CLI.
- Denial of service. Malformed XER inputs that exhaust memory or CPU, regex catastrophic-backtracking attacks against alert messages, infinite loops in the driving-path tracer on cyclic logic.
- Supply-chain attack vectors. The validator ships zero third-party runtime dependencies in production — a vendored or transitive dependency appearing in CI is itself a finding. Build-time arbitrary code execution, post-install scripts, CI secret exfiltration are in scope. The bundled
scripts/xer_parser.pyis vendored from a pinnedcpp-xer-parsercommit and CI verifies it byte for byte on every push; a bundled copy that does not match its pin is a finding.
- Performance degradation that does not affect correctness. "It got 12% slower on a 50,000-activity XER" is not a security issue. Open a normal performance bug.
- Style / lint issues. Including pyflakes, black, and "best practice" complaints.
- Citations that "could be worded better." Citation defects are handled through the regular issue template, not the security channel. Wrong, mis-attributed, or fabricated citations are release-blocking, but they are not security vulnerabilities.
- The optional LPM cross-check unavailable when
cpmmodule is absent. The validator gracefully degrades; the no-engine path is the documented behavior, not a security issue. - Theoretical attacks with no demonstrated reproduction against a current release.
We follow a 90-day coordinated-disclosure timeline:
- Day 0 — report received, reporter acknowledged within 72 hours.
- Day 0-7 — triage, severity assignment, fix plan.
- Day 7-60 — fix developed, tested against the full validator test suite plus any new regression test the reporter supplies.
- Day 60-90 — release coordinated with the reporter. Both sides agree a public-disclosure date.
- Day 90 — public disclosure (CHANGELOG entry, GitHub Security Advisory, optional CVE) regardless of whether all downstream consumers have upgraded. The validator is open-source; closed downstream consumers are responsible for their own patch windows.
If the issue is being actively exploited in the wild, we will compress the timeline and ship as soon as a fix is verified.
We do not currently run a paid bug-bounty program. We will credit reporters in the release notes and on the project README. If your employer requires a bounty as a condition of disclosure, please email anyway and we can discuss.
In scope:
cpp-critical-path-validatorsource on GitHub- The bundled
scripts/cp_validator.py,scripts/dcma14.py,scripts/validation.py, andscripts/config_profiles.py - The bundled
scripts/xer_parser.py, where the issue is a divergence from the upstream commit it is pinned to (also report upstream againstcpp-xer-parser) criticalpathpartners.cawebsite to the extent it advertises validator behavior
Out of scope:
- Third-party clones, forks, or re-distributions
- The optional LPM cross-check feature when
cpmmodule fromcpp-cpm-engineis not onsys.path— this is documented graceful-degradation behavior - The closed CPP forensic skill suite — these have their own security channel; email
hello@criticalpathpartners.caand we will route.
Last updated: 2026-09-02.