Eighteen years inside operator networks in Rwanda — MTN, Tigo, Airtel — on Ericsson, ZTE, Nokia and Huawei, from 2G CS core to 5G SA, IMS/VoLTE, signalling and cloud-native core. I find the first deviation, prove the cause from the trace and counters, and hand over the fix with its rollback and the checks that show it held.
Everything below runs in your browser. The file never leaves your machine. Press Sample to see the verdict, then try your own file with a 3-day trial code.
| Tool | What you get | Open |
|---|---|---|
| kget → Excel | Ericsson kget dump to a clean workbook, one sheet per MO class, nothing dropped silently | Run it · ⭐ repo |
| PUSCH Power | Ericsson NR UL/DL power from AMOS printouts: TS 38.213 uplink budget, EPRE chain, AMOS change with read-back and rollback | Run it |
| VoNR Loss | VoNR DL/UL packet loss per cell from PDCP QoS counters or TS 28.552, with 95 % intervals and an XLSX report | Run it |
| Site Check | Nokia LTE/GSM: feature switches gone off against a healthy site, 4G loss after USSD, SDCCH/CCCH shortage | Run it |
| Signalling Cause Decoder | SIP, Q.850, Diameter, GTPv2 and 5GMM causes decoded, ranked, with the first place to look | Run it |
| SIM-Box Finder | Bypassed routes, SIM-box lines to bar, their cells and the termination revenue at risk | Run it |
| 3G Switch-off Readiness | VoLTE readiness and 3G-only devices by area against the switch-off date | Run it |
| QoS Return Check | Monthly QoS return checked KPI by KPI before filing, with the francs at stake | Run it |
| Site Energy Baseline | Measured energy and emissions baseline per site, fuel-loss sites flagged | Run it |
All other sectors — payments, banking, insurance, utilities, transport, ERP (27 tools)
| Sector | Tools |
|---|---|
| Fraud & revenue | Payment Failure Decoder · Collections Reconciler · Settlement Checker · SIM-Swap Risk Window · International Bypass Lens |
| Telecom quality | OTP & SMS Delivery Lens · Channel Journey X-ray · 3G Device Census |
| Banking & insurance | Portfolio at Risk · Agent Float · ATM Uptime · Claims Red-Flag Scanner · Motor Loss Ratio · Billing Collection |
| Energy & power | Backup Autonomy · Power Reliability Index (IEEE 1366) · Data Centre PUE · Meter Loss Finder |
| Public services & transport | Link SLA Auditor · API & App Health · Bus On-Time · Fleet Fuel Leak Finder · Water Loss Balance · Turnaround & Backlog · Contact Centre Staffing |
| ERP & e-invoicing | Deal Sizer · Fiscal Check (EBM · eTIMS · EFRIS) · Import Guard |
Full catalogue: fkamanzi.github.io/telco-portfolio/tools
| You have | I deliver |
|---|---|
| An attach, VoLTE, session or handover failure nobody can close | Written root cause with first deviation, cause value, fix, rollback and verification — 3 days |
| A vendor escalation, RFP or due-diligence question | Vendor-neutral second opinion across Ericsson, ZTE, Nokia and Huawei |
| Diesel sites, battery failures, a climate-finance proposal | Measured site-energy baseline and MRV your funder can check |
| A team moving to 5G SA | Hands-on build-it, break-it, fix-it 5G core training |
| A recurring analysis your engineers do by hand | A browser tool built for your data, like the 36 above |
Start: send one trace, alarm export or KPI file to fkamanzi@gmail.com or WhatsApp. You get the scope and a fixed price before any work starts.
If a tool saved you an hour, star telco-portfolio — new tools land there first and starring is how you hear about them.
Kigali, Rwanda · English · Français · Kiswahili · Kinyarwanda · Remote and on-site across Africa
Prepared by Frutos Kamanzi - CEO Founder SAANO AI NETWORKS