Skip to content
Merged
Show file tree
Hide file tree
Changes from all commits
Commits
File filter

Filter by extension

Filter by extension

Conversations
Failed to load comments.
Loading
Jump to
Jump to file
Failed to load files.
Loading
Diff view
Diff view
19 changes: 19 additions & 0 deletions CHANGELOG.md
Original file line number Diff line number Diff line change
Expand Up @@ -135,6 +135,25 @@ code.

## Package releases

### 0.7.3 - 2026-11-18

Data contract 1.21.0, unchanged, and **no number moves**: comments in
`catalog.py`, CITATIONS.md and `__version__`; `catalog.py` parses to the same
AST. Applies General_Research rc-523, rc-524, rc-527, rc-529 and rc-602, which
ask what each world-production ceiling and the earth-surface water price
stand on.

- Silver's 26,000 t is USGS MCS 2026's 2025e mine output (rc-523).
- Iridium, rhodium and ruthenium have no recorded edition and MCS does not
report them singly: rounded scenarios, beside Johnson Matthey's 2025
primary supply (rc-524).
- Sulfur's 83 Mt is not the group's MCS 2025 figure (85 Mt); it sits about
1% under MCS 2026's 83.9 and 84.0 Mt and is kept (rc-527).
- Elemental phosphorus's 1 Mt is a scenario inside JRC's 900-1,200 kt/yr
estimate (rc-529).
- The earth-surface water price is a scenario; Omaha MUD's industrial tariff,
$0.000694/kg at the marginal rate, is one comparator (rc-602).

### 0.7.2 - 2026-11-18

Data contract 1.21.0, unchanged, and **no number moves**: CITATIONS.md, one
Expand Down
10 changes: 10 additions & 0 deletions CITATIONS.md
Original file line number Diff line number Diff line change
Expand Up @@ -212,6 +212,16 @@ Cited in code comments beside a value they explain; none reaches a value.
<https://ntrs.nasa.gov/citations/20080022947>, pp. 1–2 and 33 (concrete
from recovered lunar troilite sulfur: a post-extraction comparator, not
raw sulfide utility).
- **Beside the world-production ceilings and the water price**, none a new
value (General_Research rc-523, rc-524, rc-527, rc-529, rc-602): USGS,
*Mineral Commodity Summaries 2026*, Silver (26,000 t mined, 2025e) and
Sulfur (83.9 Mt for 2024, 84.0 Mt 2025e, p. 2) chapters; Johnson Matthey,
*PGM Market Report 2026*, pp. 32-34 (2025 primary supply of iridium,
rhodium and ruthenium, a different series from the scenario figures);
Matos et al. 2021, JRC EUR 30704 EN, sec. 7.2, p. 31 (world elemental P4
900-1,200 kt/yr, precise figure unknown); and Metropolitan Utilities
District (Omaha), *Schedule W-3*, effective 2 Jan 2026 (an industrial
water tariff beside the earth-surface water scenario).
- **Beside the demand shares and prices**: Kornuta et al. 2019 and LunA-10
(rc-432); USGS MCS 2025 amorphous graphite and Platts N330 carbon black
(rc-508); Cabri, Harris & Weiser 1996 (native PGM, rc-512); Kutyrev et
Expand Down
2 changes: 1 addition & 1 deletion spacevalue/__init__.py
Original file line number Diff line number Diff line change
Expand Up @@ -33,7 +33,7 @@

# The PACKAGE release. Not the data contract: that is
# `MineralValueConfig.pipeline_version`, stamped into every row.
__version__ = "0.7.2"
__version__ = "0.7.3"

# Each public name, and the submodule that defines it.
_LAZY = {name: "catalog" for name in (
Expand Down
23 changes: 21 additions & 2 deletions spacevalue/catalog.py
Original file line number Diff line number Diff line change
Expand Up @@ -331,7 +331,11 @@ def _per_tonne_to_per_kg(usd_per_tonne: float) -> float:

# Terrestrial bulk-industrial water, for the earth_surface case. Municipal /
# industrial bulk water runs $0.0005-0.002/kg; asteroid water landed on Earth
# competes with rain.
# competes with rain. $0.001/kg and its band are a SCENARIO with no named
# sale point. One delivered comparator: Omaha MUD's 2026 Schedule W-3, $1.9657
# per CCF above 5,000 CCF a month, at its 748 US gal per CCF is $0.000694/kg
# before the monthly minimum, service charge and 2% in-city addition; one
# utility's tariff, not an asteroid-water netback (General_Research rc-602).
_EARTH_SURFACE_WATER_USD_PER_KG = 0.001


Expand Down Expand Up @@ -932,13 +936,20 @@ def in_space_utility(name: str, destination: str) -> float:
ANNUAL_WORLD_PRODUCTION_KG: Dict[str, float] = {
# Precious: small markets, and the ones asteroid mining always targets
"osmium": 5.0e2, # ~500-550 kg/yr over 2024-25 (IPA/SFA factsheet, 2026), a by-product of a by-product
# Iridium, rhodium and ruthenium: no edition or series is recorded for these
# three, and USGS MCS does not report them one by one, so they are rounded
# scenario figures, not mine production read from MCS. The comparator is
# a different series: Johnson Matthey's PGM Market Report 2026 gives 2025
# total primary supply of 7.1 t Ir (p. 34), 21.8 t Rh (p. 32) and 30.2 t
# Ru (p. 33); the stored figures run 5.6% and 5.5% above it for the first
# two and 0.7% below for ruthenium (General_Research rc-524).
"iridium": 7.5e3, # ~7.5 t
"rhodium": 2.3e4, # ~23 t
"ruthenium": 3.0e4, # ~30 t
"platinum": 1.7e5, # ~170 t mined, 2025e (USGS MCS 2026)
"palladium": 1.9e5, # ~190 t mined, 2025e (USGS MCS 2026)
"gold": 3.3e6, # ~3,300 t mined, 2025e (USGS MCS 2026)
"silver": 2.6e7, # ~26,000 t
"silver": 2.6e7, # ~26,000 t mined, 2025e (USGS MCS 2026, Silver), mine output and not demand (rc-523)
# Base metals; large markets, saturation effectively never binds
"cobalt": 3.1e8, # ~310,000 t mined, 2025 (USGS MCS 2026)
"copper": 2.3e10, # ~23 Mt mined, 2024 and 2025e; refinery 29 Mt, 2025e (USGS MCS 2026)
Expand All @@ -952,7 +963,15 @@ def in_space_utility(name: str, destination: str) -> float:
"molybdenum": 2.6e8, # ~260,000 t
"titanium": 3.2e8, # ~320,000 t sponge, excluding the U.S.
"chromium": 4.7e10, # ~47 Mt shipping-grade chromite ore, the market it trades in
# Elemental P4 has no USGS series (MCS reports phosphate-rock mine output).
# JRC EUR 30704 EN, sec. 7.2, p. 31, says world P4 production "is not
# known" and estimates 900-1,200 kt/yr; 1 Mt is an approximate scenario
# inside that (General_Research rc-529).
"phosphorus": 1.0e9, # ~1 Mt elemental P4 (phosphate rock is 240 Mt)
# Sulfur is not this group's MCS 2025 figure (85 Mt for 2024). MCS 2026
# revises 2024 to 83.9 Mt and estimates 84.0 Mt for 2025 (Sulfur, p. 2);
# 83 Mt is a rounded figure whose edition is not recorded, about 1% under
# both, and is kept (General_Research rc-527).
"sulfur": 8.3e10, # ~83 Mt
"ammonia": 1.5e11, # ~150 Mt N as ammonia
"carbon dioxide": 2.3e11, # ~230 Mt merchant CO2
Expand Down
Loading