Business analyst in EMEA business planning. I own the EMEA Workstation channel forecast end to end, support UK and Ireland end user planning and forecasting, and build the team's Power BI reporting.
Before that, two years in UK and Ireland sales operations as the only territory planning analyst for 31 inside and field sellers, rebuilding three verticals in sequence: financial and retail services, Ireland corporate, and education. Territory design, TAM validation and master data governance.
Barcelona · LinkedIn · Portfolio
Forecasts and coverage models both fail on the data underneath them. I re-establish every figure against its primary source and correct it upstream, before it reaches a forecast or a quota.
Every claim carries an evidence tier:
| Tier | Meaning |
|---|---|
| FACT | Taken verbatim from a statutory filing |
| DERIVED | Calculated from verified figures, with the method stated |
| ESTIMATE | No statutory source exists |
What cannot be verified is logged as a gap, never inferred.
Every move reconciles before the case closes. Opening ties to closing, and my own corrections are held separately from forecast movement so the two can be audited independently.
All three repositories run on generated data. No client or employer information appears in any of them.
The coverage audit rebuilt as a three-page Power BI report.
- Account health: 400 accounts, 42.5 percent carrying a defect, 28 percent of TAM sitting on a defective record
- TAM reconciliation: opening to closing per rep, corrections held apart from reforecast, variance zero on every row
- Forecast consolidation: six markets submit a file each week, Power Query reads the folder, and a completeness grid and an exceptions table gate the number before it can be submitted
- Six tables in two subject areas, 44 DAX measures each documented with its expected value, a folder combine of 47 weekly files
- The .pbix, the data, the measures, the M and a build guide are all in the repository
Power BI Desktop only for now. Not yet published to the service, so no scheduled refresh or row-level security. Those are next, in that order.
The same coverage audit in Python, with the data model and the analysis.
- 400 accounts, 24 territories, 12 reps, 5 relational tables, three verticals
- 31-point integrity check before any figure is reported
- Account health, TAM at risk, live bid exposure, rep-level before and after
Findings: 42.5 percent of accounts carried a hierarchy defect at baseline, $2.97M of TAM (28 percent of the modeled portfolio) sat behind alignment problems, 119 accounts had live bids and 48 of those were on a defective record, and 37 percent of correction cases were still stalled in the workflow. Correction moved seven rep books down and five up. The bottleneck was the process, not only the data.
A corporate book being restructured inside a planning cycle, modeled in SQL.
- Eight-table schema with referential integrity, check constraints and validity dating
- Recursive CTE for group hierarchy resolution, with a cycle guard
- Case lifecycle analysis across a status funnel
- A TAM reconciliation that ties opening to closing or fails
- Twelve queries, eight PASS/FAIL integrity checks that run before any figure is published
The design decision worth noting: movement caused by cases is held in a separate column from movement caused by the forecast refresh, so one contributor's effect can be isolated from background change.
SQL · Python (pandas, matplotlib) · Power BI (Desktop: data model, DAX, Power Query; self-taught 2026) · Tableau · Advanced Excel · R
Salesforce (12 years) · Microsoft Dynamics CRM · Companies House and statutory filings
Google Data Analytics Professional Certificate · Data Analysis with R Programming