Skip to content

docs(evidence): MPP charge and channel through wasit run, on the board - #47

Merged
dzakwannajmi merged 1 commit into
mainfrom
docs/w3-1-mpp-live-check
Nov 24, 2026
Merged

dzakwannajmi merged 1 commit into
mainfrom
docs/w3-1-mpp-live-check

Conversation

@dzakwannajmi

Copy link
Copy Markdown
Collaborator

Docs only: files under .planning/instawards/sow2/. No code.

On 2026-11-24 the maintainer ran the MPP checks through wasit run, on their own machine, against Wasit's local MPP test services on the Stellar test network:

  • MPP-01 (charge) passed. Its payment 4349…bf83 was read back on Horizon: one successful operation, 0.0010000 USDC from the payer to the receiver. The plan ($0.001 of the $5.00 cap) was printed before anything was signed.
  • Channel: MPP-11, MPP-12 and MPP-14 passed. MPP-10 was skipped because the channel's expected terms were not in the config. MPP-13 is never run by wasit run.

Changed:

  • Job 03: a new section on these runs. The first acceptance criterion is now partly done (🟡).
  • The evidence table: the row "MPP charge and channel runs" is 🟡.
  • The status board: a session log row, plus the week 3 and job 03 status.
  • New copies in week-2/copies/mpp-local-run/: the terminal output, with the prompt removed and the commands shortened, and the two comments wasit ci-report wrote from these runs.

The code is on a local branch and becomes public with the release. The run in the example project, through the Action, comes then.

The maintainer ran the MPP checks through wasit run on 2026-11-24 against
the local MPP test services: MPP-01 passed and its payment was read back
on Horizon; the channel checks MPP-11, 12 and 14 passed, MPP-10 was
skipped, MPP-13 is never run. Job 03, the evidence table and the status
board now show it as partly done (🟡), with copies of the output and of
the comment written from those runs. The code becomes public with the
release; the run in the example project comes then.
@vercel

vercel Bot commented Nov 24, 2026 •

Copy link
Copy Markdown

The latest updates on your projects. Learn more about Vercel for GitHub.

Project Deployment Actions Updated
wasit Ready Ready Preview Nov 24, 2026 5:05am UTC

@dzakwannajmi
dzakwannajmi merged commit 939d85f into main Nov 24, 2026
5 checks passed

This branch was successfully deployed

1 active deployment
Preview — e79d64f8 Deployed Nov 24, 2026 by vercel[bot]
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant