Skip to content
Merged
Show file tree
Hide file tree
Changes from all commits
Commits
File filter

Filter by extension

Filter by extension

Conversations
Failed to load comments.
Loading
Jump to
Jump to file
Failed to load files.
Loading
Diff view
Diff view
16 changes: 14 additions & 2 deletions README.md
Original file line number Diff line number Diff line change
Expand Up @@ -14,10 +14,22 @@ human-readable evidence, and unsafe or unavailable paths fail closed.
read-only proofs completed for MikroTik Lab1 and Lab2, each through the same
target-aware fail-closed runtime, one exact command, and zero retries. The
Lab2 proof also has independently reviewed persistent startup bindings and
fresh-process reconstruction. Final closure still requires independent review
and remote Safe CI.
fresh-process reconstruction. A new prospective documentation candidate dated
**2026-11-08** starts at `c09e634100f7d87516838b573e0d29037e422fc7`.
Historical PR #92 merged and declared closure, but its pre-commit independent
review provenance remains **NOT_ESTABLISHED**; the recovered historical
post-CI PASS has a provenance limitation. Neither result supplies this new
candidate's review or CI. The unchanged closure sequence still requires a
different Agent's pre-commit review, a separately authorized commit and push,
exact-commit Safe CI, and independent post-CI review before formal closure.
[Closure candidate scope and evidence](docs/automation_readiness/stage2_formal_closure.md).

FIX-04 Candidate technical acceptance remains **ACCEPTED_WITH_NOTES**;
Inactive Runtime Binding is **NOT_ESTABLISHED** and Deployment Acceptance is
**PENDING**. The [six retained Owner notes](docs/automation_readiness/actual_automation_integration_plan.md#stage-2-read-only-lab-adapter)
remain binding. No Root Activation, Approval Signing/Placement, or NAL Live
authority is granted.

The August 2026 release baseline is a local Stage-0 product.
The supported release path is designed for local portfolio review: mock-only,
dry-run, report-only, and display-oriented. Reviewers do not
Expand Down
51 changes: 47 additions & 4 deletions docs/automation_readiness/actual_automation_integration_plan.md
Original file line number Diff line number Diff line change
Expand Up @@ -4,8 +4,11 @@
Owner-authorized MikroTik Lab1 VRRP proof remains accepted, and a later,
separately authorized Lab2 one-shot proof passed through the same target-aware
runtime. Persistent Lab2 startup bindings, fresh-process reconstruction, and
their independent review also passed. Final Stage-2 closure still requires the
separate independent closure review and remote Safe CI. The default public
their independent review also passed. The 2026-11-08 prospective candidate
preserves the historical PR #92 declaration and the unresolved pre-commit
review provenance. Final Stage-2 closure requires the unchanged pre-commit
review, commit/push, exact-commit Safe CI, and independent post-CI review
sequence in the [closure record](stage2_formal_closure.md). The default public
review path remains Stage-0 offline evidence browsing. Stage 3 is **NOT
STARTED / requires separate Owner authorization**.

Expand Down Expand Up @@ -234,8 +237,48 @@ Exit gate:

Status: **CLOSURE CANDIDATE**. The earlier Lab1 proof and later Lab2 proof each
passed under separate exact Owner authorization. The Lab2 runtime closure gap
is resolved, but final Stage-2 closure awaits independent closure review and
remote Safe CI. Neither proof authorizes another attempt.
is resolved. A new prospective documentation candidate was prepared on
2026-11-08 from `c09e634100f7d87516838b573e0d29037e422fc7`. Historical PR #92
merged and declared closure, but its pre-commit independent review remains
NOT_ESTABLISHED; recovered historical post-CI review is
PASS_WITH_PROVENANCE_LIMITATION. Those historical records do not satisfy the
new candidate's Gates. Its pre-commit independent review is PENDING, its commit
is NOT_CREATED, and its remote Safe CI and post-CI review are NOT_RUN. Follow
the unchanged [Closure Contract section 13](stage2_formal_closure.md#13-closure-criteria).
Neither live proof authorizes another attempt, and this prospective work does
not revalidate the historical technical results or grant deployment authority.

**A-02 FIX-04: Candidate technical acceptance is ACCEPTED_WITH_NOTES;
Deployment Acceptance remains PENDING.** The Owner designated this Stage-2
section as the formal record solely for this bounded Candidate technical
acceptance; this designation does not redefine all FIX-04 governance documents.
The accepted evidence covers the Candidate Directory, approvals directory, and
Owner Trust Root JSON against the fixed historical baseline at the time below.

FIX-04 Provisioning was a separately authorized asset-creation operation that
wrote Candidate assets. The subsequent Candidate acceptance was read-only.
This documentation update records those completed results without repeating
either operation. It does not change the historical Lab1/Lab2 evidence or
complete Stage-2 closure. It grants no authority to apply Startup Pins, activate
the Root, sign or place Approvals, or perform NAL Live operations.

```text
FIX04_PROVISIONING = SUCCESS
CANDIDATE_TECHNICAL_REVIEW = PASS_WITH_NOTES
OWNER_CANDIDATE_ACCEPTANCE = ACCEPTED_WITH_NOTES
ACCEPTANCE_EVIDENCE_TIME = 2026-11-05 09:36:17.897018–09:36:17.908829 Asia/Taipei
INACTIVE_RUNTIME_BINDING_VERIFICATION = NOT_ESTABLISHED
OWNER_DEPLOYMENT_ACCEPTANCE = PENDING
```

Required Owner acceptance notes (retained verbatim):

1. 本次僅接受指定觀察時點的技術證據,不構成持續安全保證。
2. Inactive Runtime Binding 仍為 NOT_ESTABLISHED,不能宣稱 Root 已獨立證明未啟用。
3. Startup Pins 比對成功且量測器未套用,不代表所有 Startup/Runtime 均未指向新 Root。
4. 本次量測獨立於 Provisioning,但仍由同一 Assistant 執行;不同人員/Agent 獨立性未建立。原生量測來自 Codex Sandbox,非 Owner Console。
5. LastAccessTime 有 7 個物件變動、1 個不變,變動原因未建立;其餘必要一致性檢查全部 PASS。
6. 未取得原子快照、持續監控或所有未知寫入者不存在的證明;SACL 未讀取。

#### Historical Lab1 proven scope and result

Expand Down
108 changes: 91 additions & 17 deletions docs/automation_readiness/stage2_formal_closure.md
Original file line number Diff line number Diff line change
Expand Up @@ -5,25 +5,33 @@
Stage 2 is a **CLOSURE CANDIDATE**, not formally closed. The repository's
bounded S2-RO-01 through S2-RO-11 capability is complete; separate one-shot
Lab1 and Lab2 live proofs are accepted; and persistent Lab2 target and
known-host startup reconstruction passed independent review. Final closure
does not require another local validation run: the accepted local validation
for this closure candidate is complete. The remaining sequence is an
independent review of the repaired documentation, a local closure commit, a
branch push, remote Safe CI, and a subsequent independent post-Safe-CI closure
review. Only after every remaining gate passes may Stage 2 be marked formally
closed.
known-host startup reconstruction passed independent review. This is a new
prospective documentation candidate prepared on **2026-11-08**, not a backdated
historical review. Historical PR #92 declared closure, but its pre-commit
independent review provenance remains NOT_ESTABLISHED. The recovered historical
post-CI PASS does not resolve that gap or validate this new candidate.

The existing section 13 sequence remains controlling: local candidate and
offline validation, independent documentation review, a separately authorized
local commit, branch push, exact-commit remote Safe CI, and independent
post-Safe-CI closure review. Only after all required Gates pass may the Owner
make the formal closure decision. This preparation task grants no authority
for those later actions.

```text
STAGE2_STATUS = CLOSURE CANDIDATE
STAGE2_FORMAL_STATUS = CLOSURE_CANDIDATE
STAGE2_RUNTIME_CLOSURE_GAP = NONE
LOCAL_VALIDATION_STATUS = COMPLETED
LOCAL_VALIDATION_STATUS = PENDING_CURRENT_CANDIDATE_VALIDATION
REMOTE_SAFE_CI_STATUS = PENDING
POST_SAFE_CI_CLOSURE_REVIEW_STATUS = PENDING
READY_FOR_DUAL_LAB_AI_QUERY = NO
```

This record does not authorize another live attempt or begin Dual-Lab AI Query.
This record does not authorize another live attempt or begin any next phase.
Later, separately accepted offline Dual-Lab work retains its own evidence and
authority boundaries in the [Integration Plan](actual_automation_integration_plan.md);
it does not fill this candidate's missing closure Gates.

## 1. Scope

Expand Down Expand Up @@ -51,6 +59,55 @@ Repository code defines the bounded capability and validation contracts.
Repository-external Owner-controlled deployment assets supply live pins and
authority. Those are distinct trust domains.

### Prospective reconciliation: 2026-11-08

The Owner authorized a new six-file candidate from the committed base below.
The isolated candidate uses the committed Portfolio document; it does not
import the original worktree's unpublished Portfolio edits.

Historical closure commit `cf216d0870a3019925faee1870790adfdd093a3d` was
integrated by [PR #92](https://github.com/Robinlee0929/Network_Automation_Lab/pull/92)
at merge `d57b802e5d7a9cbe1d684c3dd058527685c56d62`.
The historical [Safe CI run 35743788235](https://github.com/Robinlee0929/Network_Automation_Lab/actions/runs/35743788235)
passed. PR #92's formal-closure declaration is retained as historical evidence.
Owner-authorized provenance reconciliation found the original post-CI review
PASS, but could not establish the preceding independent pre-commit PASS; the
historical Owner closure instruction was conditional. These are retained
findings, not a new search or a replacement historical PASS. The full historical
closure chain therefore remains unconfirmed.

```text
HISTORICAL_PRE_COMMIT_REVIEW = NOT_ESTABLISHED
HISTORICAL_POST_CI_REVIEW = PASS_WITH_PROVENANCE_LIMITATION
PR92_MERGE = COMPLETED
CURRENT_CANDIDATE_DATE = 2026-11-08
CURRENT_CANDIDATE_BASE = c09e634100f7d87516838b573e0d29037e422fc7
CURRENT_PRECOMMIT_INDEPENDENT_REVIEW = PENDING
CURRENT_CANDIDATE_COMMIT = NOT_CREATED
CURRENT_CANDIDATE_REMOTE_SAFE_CI = NOT_RUN
CURRENT_POST_CI_REVIEW = NOT_RUN
STAGE2_FORMAL_STATUS = CLOSURE_CANDIDATE
FIX04_CANDIDATE_ACCEPTANCE = ACCEPTED_WITH_NOTES
FIX04_INACTIVE_RUNTIME_BINDING = NOT_ESTABLISHED
FIX04_DEPLOYMENT_ACCEPTANCE = PENDING
ROOT_ACTIVATION_AUTHORIZED = NO
APPROVAL_SIGNING_AUTHORIZED = NO
APPROVAL_PLACEMENT_AUTHORIZED = NO
DL06_02_LIVE_AUTHORIZED = NO
```

The base includes the separately committed FIX-04 Candidate technical record;
it is not the new Stage-2 closure commit. FIX-04 Provisioning wrote assets under
separate authorization; its later acceptance was read-only. Its
[six Owner acceptance notes](actual_automation_integration_plan.md#stage-2-read-only-lab-adapter)
remain verbatim and unresolved. Startup Pins comparison does not independently
prove current Runtime inactivity. FIX-04 Deployment Acceptance remains pending.

The document author prepares and self-validates this candidate. A different
Agent's pre-commit independent review is a separate, pending task; author
self-checks do not satisfy it. No historical review is backfilled and no
section 13 criterion or Gate order is waived.

## 3. S2-RO-01 through S2-RO-11 completion status

| Slice | Capability | Candidate status |
Expand Down Expand Up @@ -182,13 +239,15 @@ test passed 6/6 and its focused repository tests passed 397/397. Earlier
S2-RO-10 and S2-RO-11 integration records retain their own focused, Stage-2,
full-suite, report-index, independent-review, and hosted-CI evidence.

This closure-candidate change separately completed focused Stage-2 validation,
The historical closure-candidate change separately completed focused Stage-2 validation,
the complete Stage-2 suite, full pytest, report-index classification, and a
local documentation consistency/readability check. None of those checks
contacted Lab1 or Lab2. Remote Safe CI and the independent post-Safe-CI closure
review remain pending and do not require another local validation run.
review were still pending at that record's preparation time. The later PR #92
and provenance findings are recorded above; this paragraph is not current
candidate evidence.

Local closure-candidate validation completed with the repository code unchanged:
Historical local closure-candidate validation completed with repository code unchanged:

| Check | Result |
| --- | --- |
Expand All @@ -201,7 +260,21 @@ Local closure-candidate validation completed with the repository code unchanged:
The authoritative reruns used an isolated Windows pytest temporary directory.
The full-suite rerun used the existing installed Node dependency tree so Node
subprocess fixtures could resolve TypeScript; no dependency was installed or
changed. These are local checks only. Remote Safe CI remains pending.
changed. These are historical local checks only, not the 2026-11-08 candidate's
validation or proof that the newly installed Node tree is identical to the
historical environment.

### Current candidate validation

The prospective candidate requires fresh focused target-registry/composition/
entrypoint tests, complete `tests/stage2`, full `python -m pytest`, and
`python network_lab.py --task report-index`, followed by document/Diff checks.
Each pytest run uses its own new Windows temporary directory outside the
repository, preserving the replay ledger's repository-exclusion Gate.
Python 3.13.7 / pytest 8.4.2 and Node 22.23.2 / npm 10.9.8 / TypeScript 5.9.3
are the verified local environment. No dependency installation or live proof
is part of this task. Current results and candidate hashes must be recorded
before handoff; historical counts above are not substitutes.

## 11. Historical limitations and unresolved provenance

Expand All @@ -227,15 +300,16 @@ This candidate must not be interpreted to mean that:
- repository source reachability grants execution authority;
- generic RouterOS, multi-vendor, arbitrary-command, write, production, fleet,
or autonomous-remediation capability exists;
- Dual-Lab AI Query already exists; or
- this candidate grants Dual-Lab AI Query authority (later offline acceptance
has its own separate record); or
- Stage 2 is formally closed before remote Safe CI and the subsequent
independent post-Safe-CI closure review.

## 13. Closure criteria

Local validation for the current closure candidate is complete. Stage 2 may be
labeled formally closed only after the remaining governance sequence also
completes. The controlling order is:
The prospective candidate must satisfy the existing local validation Gates
with its own evidence. Stage 2 may be labeled formally closed only after the
full governance sequence completes. The controlling order is unchanged:

```text
local closure candidate
Expand Down
Original file line number Diff line number Diff line change
Expand Up @@ -32,8 +32,23 @@ CANONICAL_STATUS = LAB2_PROOF_COMPLETE_STAGE2_CLOSURE_CANDIDATE
The accepted Lab2 proof covers one target, one operation, one command, and one
consumed authorization only. It does not revalidate Lab1, prove overall VRRP
pair health, establish production readiness or write automation, or grant
future live authority. Stage 2 remains a closure candidate until the separate
independent closure review and remote Safe CI complete.
future live authority. Stage 2 remains a closure candidate under the unchanged
[section 13 closure sequence](stage2_formal_closure.md#13-closure-criteria).

The 2026-11-08 prospective documentation candidate starts from
`c09e634100f7d87516838b573e0d29037e422fc7`. Historical PR #92 merged and declared
closure; its pre-commit independent review remains NOT_ESTABLISHED and its
recovered post-CI review is PASS_WITH_PROVENANCE_LIMITATION. This component's
accepted technical evidence below is preserved and supplies neither the new
pre-commit review nor its exact-commit Safe CI. New review is PENDING, the new
commit is NOT_CREATED, and new remote CI/post-CI review are NOT_RUN.

FIX-04 Candidate acceptance is ACCEPTED_WITH_NOTES; Inactive Runtime Binding
is NOT_ESTABLISHED and Deployment Acceptance is PENDING. The historical Lab2
startup proof below does not prove whether Runtime uses the new FIX-04 Root.
The [six retained FIX-04 notes](actual_automation_integration_plan.md#stage-2-read-only-lab-adapter)
remain applicable. No activation, Approval Signing/Placement, live invocation,
or next-phase authority is granted by this documentation preparation.

`OFFLINE_IMPLEMENTATION_AUTHORITY != LIVE_EXECUTION_AUTHORITY`

Expand Down
Original file line number Diff line number Diff line change
Expand Up @@ -7,8 +7,23 @@ runtime. Its implementation and independent security review passed with zero
unresolved material findings. A later, separately authorized Lab2 one-shot
invocation also passed and its proof is closed. The entrypoint returns only
canonical S2-RO-01 evidence bytes or one sanitized failure category. The
overall Stage-2 status remains **CLOSURE CANDIDATE** pending independent
closure review and remote Safe CI.
overall Stage-2 status remains **CLOSURE CANDIDATE** under the unchanged
[section 13 closure sequence](stage2_formal_closure.md#13-closure-criteria).

The 2026-11-08 prospective documentation candidate starts from
`c09e634100f7d87516838b573e0d29037e422fc7`. Historical PR #92 merged and declared
closure, but its pre-commit independent review is NOT_ESTABLISHED; recovered
historical post-CI review is PASS_WITH_PROVENANCE_LIMITATION. Those results and
the component evidence below do not validate this new candidate. Its separate
pre-commit review is PENDING, commit NOT_CREATED, and remote CI/post-CI review
NOT_RUN. Author self-validation cannot replace a different Agent's review.

FIX-04 Candidate acceptance remains ACCEPTED_WITH_NOTES, Inactive Runtime
Binding NOT_ESTABLISHED, and Deployment Acceptance PENDING. The
[six retained Owner notes](actual_automation_integration_plan.md#stage-2-read-only-lab-adapter)
are unchanged. The historical startup reconstruction below does not establish
the new FIX-04 Root's current Runtime use. No Root Activation, Approval
Signing/Placement, live entrypoint invocation, or next-phase authority follows.

`S2_RO_11_IMPLEMENTED != REAL_RUN_AUTHORIZED`

Expand All @@ -18,7 +33,7 @@ closure review and remote Safe CI.

## Allowed scope and API

Exactly three candidate files are included:
The historical S2-RO-11 implementation candidate included exactly three files:

- [Entrypoint](../../validation_framework/stage2_vrrp_readonly_live_entrypoint.py).
- [Offline tests](../../tests/stage2/test_vrrp_readonly_live_entrypoint.py).
Expand Down
18 changes: 16 additions & 2 deletions docs/portfolio/public_reviewer_walkthrough.md
Original file line number Diff line number Diff line change
Expand Up @@ -11,11 +11,25 @@ calls, secrets, or command execution from the dashboard.
**Stage 2 is a CLOSURE CANDIDATE.** Separate Owner-authorized one-shot
MikroTik Lab1 and Lab2 VRRP proofs completed through the bounded read-only
runtime. Persistent Lab2 startup reconstruction also passed independent
review. Final closure still requires independent closure review and remote
Safe CI. The results can be explained offline using the
review. The 2026-11-08 prospective documentation candidate starts from
`c09e634100f7d87516838b573e0d29037e422fc7`. Historical PR #92 merged and declared
closure, but its pre-commit independent review provenance remains
NOT_ESTABLISHED; recovered historical post-CI PASS has a provenance limitation.
It is not a new-candidate PASS. Pre-commit independent review is PENDING,
the new commit is NOT_CREATED, and new remote Safe CI/post-CI review are NOT_RUN.
The existing review -> commit/push -> exact-commit Safe CI -> independent
post-CI review sequence still controls formal closure. Explain these boundaries
and the retained technical results offline using the
[formal closure candidate](../automation_readiness/stage2_formal_closure.md).
Stage 3 is **NOT STARTED**.

FIX-04 Candidate technical acceptance is ACCEPTED_WITH_NOTES, while Inactive
Runtime Binding is NOT_ESTABLISHED and Deployment Acceptance remains PENDING.
Keep the [six Owner acceptance notes](../automation_readiness/actual_automation_integration_plan.md#stage-2-read-only-lab-adapter)
with this explanation. Startup Pins comparison does not prove Runtime
inactivity. This walkthrough grants no Root Activation, Approval
Signing/Placement, NAL Live, or next-phase authority.

## One-Sentence Project Positioning

Network Automation Lab is a safety-first Python portfolio project that turns
Expand Down
Loading